My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ01949 (4)
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
PROJ01949 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/13/2010 10:40:59 AM
Creation date
2/26/2008 10:04:17 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153031
Contractor Name
Meeker, Town of
Contract Type
Loan
Water District
43
County
Rio Blanco
Bill Number
SB 75-468
Loan Projects - Doc Type
Project Summary
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />The proposed improvements are divided into two phases. The <br />first phase work carried the program through 1977. The sf~cond <br />phase is for the remaininq period through 1990. Further, the <br />first phase is broken into Part A and B, the subphasing being <br />identified to provide additional flexibility to the Town Board in <br />the decision-makinq process as related to growth. Second phase <br />improvements would be financed exclus ivel y from water ut il i ty <br />generated income on a pay as you go basis. <br /> <br />yirs1:._~~as~!.. Pa~t A - Included the well field and <br />related facilities, a new lG-inch tr-ansmission line, <br />insulation of storage tanks, and a Zone 2 supply system. <br /> <br />First Phase, Part B - Included a 12-inch transmission <br />line extens ion, water treatment, improvements to the <br />distribution system, and related facilities. <br /> <br />Second Phase - Improvements to existinq distribution <br />system, additional wells and related facilities. <br /> <br />COSTS <br /> <br />The proposed project was estimated to cost $2.25 million for <br />the first phase. Additional work would relate to growth rates <br />and utility income. <br /> <br />The total annual estimated operation, maintenance and <br />replacement costs for the first phase system was $69,700 per year <br />for Parts A and B, and those existing operation and maintenance <br />commitments of the Town which will remain. <br /> <br />Evaluation of the project demonstrated that with state and <br />federal aid, the proposed improvements need not be a growth <br />generator in themselves, though an increase in water rents would <br />be necessary under low growth conditions. <br /> <br />-5- <br />
The URL can be used to link to this page
Your browser does not support the video tag.