<br />B. Design and Construction Elements <br /> <br />1. Hydrologic analysis was not required. <br />2. Hydraulic design requirements were completed using <br />guidance from the Area Engineer and State Engineer. <br />3. Geotechincal analysis/design requirements were not <br />needed. <br />4. Structural design requirements were met using an <br />NRCS standard design dated September 1999 by <br />technician Jim Schaffer. <br />5. The field office staff addressed environmental <br />considerations. <br />6. A set of plans containing plan and section views of <br />the structures is completed. <br />7. Construction specifications that were used were in <br />accordance with the Structure for Water Control <br />Standard, code #587. <br />8. Construction inspection requirements will include <br />an inspector on site during staking and placement <br />of each of the thirteen (13) structures. <br /> <br />IV. STAFF REQUIREMENTS <br /> <br /> Duration <br />Task (days) Start Date End Date Lead Person <br />Finish Planning: 1 day July 2003 July 2003 L. Clark <br />Design Hydrology: n/a <br />Design Survey: 1 day July 2003 July 2003 L. Clark <br />Geologic Investigation: L. Clark <br />Soil Mechanics: L. Clark <br />Preliminary Design: 1 days July 2003 July 2003 L. Clark <br />Drawings and Specs: 5 days August 2003 August 2003 L. Clark <br />Design Review: 1 day August 2003 August 2003 R. Clark <br />Final Drawings and Specs: 1 day August 2003 August 2003 L. Clark <br />Design Approval: 1 day R. Clark <br />Permits and Easements: L. Clark <br />Land Rights Acquisition: <br />Project Agreement: <br />Award Contract: <br />Construction Inspection: 30 days Fall 2003 Fall 2003 L. Clark <br />Final Inspection: L. Clark <br />As Built Drawings: L. Clark <br />Total Time: 41 days Estimated Completion Date: 11-01-2003 <br /> <br />....." <br /> <br />L <br />