My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150155 Feasibility Study
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
C150155 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2015 9:44:15 AM
Creation date
2/26/2008 9:58:55 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150155
Contractor Name
Rio Grande and Piedra Valley Ditch Company
Contract Type
Loan
Water District
20
County
Rio Grande
Bill Number
SPL
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />PRELIMINARY DESIGN REPORT <br /> <br />Project Name: <br />Engineering Job Class: <br /> <br />RG and Piedra Valley Ditch Company <br />III <br /> <br />Owner/Sponsor: <br /> <br />RG and Piedra Valley Ditch Company <br />USDA - NRCS <br />CWCB <br /> <br />Field Office: <br />Soil Conservation District: <br /> <br />Monte Vista <br />Rio Grande <br /> <br />Prepared By: <br />Date of Report: <br /> <br />Laurie A. Clark <br />July 30, 2003 <br /> <br />I. PROJECT DESCRIPTION <br /> <br />A. Location <br /> <br />1. Section 27, Township 39 North, Range 7 East <br />through Section 24, Township 38 North, Range 7 <br />East on the U.S.G.S. Quad Sheet Monte Vista. <br />2. The nearest town is Monte Vista, Colorado. <br />3. Accessibility to the site will be through the <br />Shareholder's properties. Although there are <br />several sloughs to cross, temporary measures can <br />be constructed to allow the heavy equipment <br />access. <br /> <br />B. Project Components <br /> <br />1. This practice will be installed under Structure <br />for Water Control, code #587. <br />2. There will be thirteen (13) steel/concrete check <br />structures installed along 9 miles of ditch. <br />Structures will be 14.0 foot wide by 8.0 foot long <br />and vary in height from 3.0 - 5.0 feet. <br />3. Hazard Classification - low. <br />4. Basis for engineering job classification is due to <br />the maximum amount of 100 cfs through the system. <br />
The URL can be used to link to this page
Your browser does not support the video tag.