Laserfiche WebLink
<br /> <br />RAW WATER STORAGE AND DISTRIBUTION SYSEM <br />COST ESTIMATE <br /> <br />ITEM <br />EARTHWORK <br />DISTRIBUTION PIPE 8" <br />6" <br />4" <br /> <br />QUANTITY UNIT <br />3,250,000 CY <br />8,000 LF <br />9,660 LF <br />48,840 LF <br />1 EA <br />1 EA <br />1 EA <br />1 EA <br />1 EA <br />120 LF <br />1 EA <br />1 EA <br />1 EA <br />1 LS <br />1 LS <br />1 LS <br />1 LS <br /> <br />B.H.EATON HEADGATE <br />INTAKE & WET WELL (WEST) <br />PUMP (WEST) <br />PUMP (WEST) <br />POWER SUPPLY (WEST) <br />PIPE TO HILLTOP CONNECTION <br />INTAKE & WET WELL (EAST) <br />PUMPS (EAST) <br />POWER SUPPLY (EAST) <br />INPROVEMENTS TO EATON DITCH <br />EROSION CONTROL <br />ENGINEERING <br />TESTING <br /> <br />SUB-TOTAL <br /> <br />CONTINGENCY 15% <br /> <br />TOTAL <br /> <br />PRICE COST <br />0.86 $ <br />18.00 $ <br />16.00 $ <br />14.00 $ <br />21,250.00 $ <br />31,000.00 $ <br />40,000.00 $ <br />65,000.00 $ <br />15,000.00 $ <br />24.00 $ <br />25,000.00 $ <br />65,000.00 $ <br />15,000.00 $ <br />10,000.00 $ <br />820,000.00 $ <br />50,000.00 $ <br />20,000.00 $ <br />$ <br />$ <br />$ <br />$ <br /> <br />2,795,000.00 <br />144,000.00 <br />154,560.00 <br />683,760.00 <br />21,250.00 <br />31,000.00 <br />40,000.00 <br />65,000.00 <br />15,000.00 <br />2,880.00 <br />25,000.00 <br />65,000.00 <br />15,000.00 <br />10,000.00 <br />820,000.00 <br />50,000.00 <br />20,000.00 <br />4,957,450.00 <br /> <br />743,617.50 <br />5,701,067.50 <br />