My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
NP minutes 1 16 08
CWCB
>
Basin Roundtables
>
DayForward
>
NP minutes 1 16 08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 4:58:06 PM
Creation date
2/22/2008 11:32:35 AM
Metadata
Fields
Template:
Basin Roundtables
Basin Roundtable
North Platte
Title
North Platte January 08 Minutes
Date
1/16/2008
Basin Roundtables - Doc Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
North Platte Roundtable Meeting Minutes, 01.16.2008 <br />Parks District USFS Conference Room, 3-5 p.m. <br />Minutes submitted by Curran Trick <br />Members/Guests Present <br />Mike Hohnholz <br />Amt Timbennann <br />Carl Trick II <br />Mike Allnutt <br />Bob Burr <br />Rick Wyatt <br />Tom Hackleman <br />Pete Conovitz <br />Ty Wattenberg <br />Jim Baller <br />Dirk Ramsey <br />John Rich <br />Dave Meyring <br />Barbara Vasquez <br />Kent Crowder <br />Debbie Alpe <br />Paula Belcher <br />Sue Petersmann <br />Mike Wright <br />Sandra Knox <br />Erin Light <br />Caid Waldron <br />Meeting called to order <br />Changes in 12.18.07 nunutes: <br />1. Clarification of the 13 year period by Barbara and Carl. The 13 year period started in <br />2006. <br />2. Change on page 3 to include "as well as flatwater lakes" to Kent's comment about <br />malting sure N. Platte identifies important lakes and streams. <br />Approval of 12.18.07 minutes: motioned and seconded. Minutes approved <br />Consideration of Colorado Naturcd Heritage Program (CNHP) application for Water <br />Supply Reserve Account funding (SO% basin account and 50% statewide account): <br />Barbara Vasquez acted as liaison for CNHI' since a CNHI' representative was not <br />present. She did a "walk thru" of the application, including reasons why the application <br />is being submitted. <br />Deliverables of the project: profiled wetlands, surveys, mapped ecological boundaries <br />The final report of the project will be submitted in `09 <br />
The URL can be used to link to this page
Your browser does not support the video tag.