My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ01934 (2)
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
PROJ01934 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:33 AM
Creation date
2/21/2008 4:31:18 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153471
Contractor Name
Frederick, Town of
Contract Type
Loan
Water District
0
County
Weld
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />\ > <br />1 t .~ <br />. . <br /> <br /> <br />Mr. Charles Klarich <br />June 5, 2002 <br />Page 2 <br /> <br />=tmc <br /> <br />Task 3 - SeeD Prevention or Collection Alternatives and ConceDtual Desi!!n <br /> <br />RMC will evaluate several alternatives for seep prevention or collection and recovery based on data <br />collected in Tasks 1 and 2 and generate conceptual level cost estimates for each alternative. RMC will <br />meet with the Town of Frederick to discuss alternatives and provide a conceptual design of the selected <br />alternative. An engineer's cost estimate for the selected design will also be provided as part of Task 2. <br /> <br />This scope of work and cost estimate has been prepared according to the effort we believe will be required. <br />The total cost of these services is approximately $24,000 as set forth in the following table: <br /> <br />Task 1 Existing Data Collection and Water Balance $4,500 <br />Task 2 Field Investigation $9,500 <br />Task 3 Seep Prevention or Collection Alternatives/. $8,500 <br /> and Conceptual Design /' <br />-- Equipment, Materials & Expenses r' $500 <br />--- Meetings ./ $1,000/ <br /> Total Estimated Cost $24,000 <br /> <br />RMC will provide a justification for the changes along with an additional budget required to complete the <br />work if necessary changes of scope arise or if additional services are required by the Town. Only when the <br />requested increase is approved will the additional work be completed. We will prepare a separate scope of <br />work for final design of the selected seep prevention or collection alternative once the work set forth in this <br />proposal is completed. Water rights will be included in a separate scope of work. Pennitting, contract <br />documents, technical specifications and wetland delineation are spe~ifically excluded from this scope of <br />work. <br /> <br />If the Agreement is acceptable, please sign both copies and return one for our files. Please call if you have <br />any questions or comments. <br /> <br />~~~ <br /> <br /> <br />Sincerely, <br /> <br />ROCKY MOUNTAIN CONSULT ANTS, INC. <br /> <br />Brad L. Hagen, P.E. <br />Water Resource Engineer <br /> <br />BLH:blh <br /> <br />Enclosures <br /> <br />G:\0092 _ 055.blh\k1arich4.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.