Laserfiche WebLink
<br /> <br />Mr. Charles Klarich <br />June 5, 2002 <br />Page 2 <br /> <br />the reservoir. Water volume andspecitic conductance measurements will be completed in the <br />stonnwater ditch which rollS adj acent to. the reservoir along WCR 13 to ascertain whether this ditch <br />may be a majorseepage loss source for the reservoir. Tasks J and 2 will provide the technical basis <br />for providing the tnost cost effective seepage collection and/or lining alternatives. <br /> <br />Task 3 - SeelJ Prevention 01' Collection Alternatives and ConceDtual Desi!!" <br /> <br />RMC will evaluate several altenlatives for seep prevention or collection and recovery based on data <br />collected in Tasks 1 and 2 and generate conceptu.allevel cost estimates for each alternative.. RMC <br />will meet with the Town of Frederick to discuss alternatives and provide a conceptual design of the . <br />selected alternative. An engineer's cost estitnate for the selected design wiU also be proVided as part <br />of Task 2, <br /> <br />Task" - eWeR Loan ADDlication Assistance <br /> <br />RMC will provide the technical data to assist in completing the application for a Colorado Water <br />Conservation Board raw water project loan. Technical assistance will include review of the economic <br />value or feasibility of the project, raw water demands and an existing water rights summary. <br /> <br />This scope of work and cost estimate has been prepared according to the effort we believe will be <br />required, The total cost of these services is approximately $24,500 as set forth in thefollowing table: <br /> <br />Task 1 Existing Data Collection and Water $4,500 <br /> Balance <br />Task 2 Field Investigation $9,500 <br />Task 3 Seep Prevention or Collection Alternatives $8,500 <br /> and Conceptual Design <br />Task 4 CWCB Loan Application Assistance $500 <br />--- Equipment, Materials & Expenses $500 <br />--- Meetings $1,000 <br /> Total Estimated Cost $24,500 <br /> <br />RMC will provide a justification for the changes along with an additional budget required to complete <br />the work if necessary changes of scope arise or if additional services are required by the Town. Only <br />when the requested increase is approved will the add.itional work be completed. We will prepare a <br />separate scope of work for filial design of the selected seep prevention or collection alternative once <br />the work set forth in this proposal is completed. Water rights will be included in a separate scope of <br />work. Permitting, contract documents, technical specifications and wetland delineation are <br />specifically excluded from this scope of work. <br /> <br />If the Agreement is acceptable, please sign both copies and return one for our files. P1casecal1 if you <br /> <br />C'n ',J <br /> <br />RCRQCIQQC'nC' '(I'" VU J <br /> <br />,.. r I"".......... _. __ _ _ __ <br /> <br />