My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150124 Contract
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
C150124 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2010 12:40:53 PM
Creation date
2/21/2008 3:28:24 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150124
Contractor Name
Shultz Farm, Inc.
Contract Type
Loan
Water District
0
County
Weld
Bill Number
MC3
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />.- <br /> <br />SECTION 8 - ELIGIBLE EXPENSES. The following items are eligible for loan disbursements. <br />A. Preparing final designs and specifications for the PROJECT. <br />B. Preparing bid and construction contract documents. <br />C. Preparing environmental assessment or environmental impact statements, and <br />otherwise complying with the Federal National Environmental Policy Act. <br />D. Complying with all federal, state, and local regulatory requirements, including the <br />obtaining of all required permits. <br />E. Fish and wildlife mitigation measures required by federal, state, or local laws and <br />regulations. <br />F. Actual construction as called for in the design documents and in change orders <br />approved by the CWCB and the BORROWER. <br />G. Engineering services for construction management, including design and construction <br />management for CWCB-approved change orders. <br />H. Interest during completion of the PROJECT pursuant to Paragraph A.2 herein. <br />I. Legal serviceS for reviewing engineering services contracts, reviewing this Contract, <br />reviewing construction contract documents, and for complying with all federal, state, <br />and local regulatory requirements. <br />SECTION 9 - DISBURSEMENT SCHEDULE <br />The BORROWER shall prepare a periodic progress report which contains a statement of the <br />PROJECT costs expended for that period and shall forward said statement to the CWCB. <br />After receipt of the periodic progress report from the BORROWER, and review and <br />acceptance of the items therein as eligible expenses as described below, the CWeB will <br />pay to the BORROWER the amount set forth in the report or such portion that has been <br />approved by the CWCB. Such payment shall be made within thirty (30) days from the <br />CWCB's approval of each progress report. <br />SECTION 10 - TIME FOR PERFORMANCE <br />PROJECT Beginning: Upon Effective Date of this Contract <br />PROJECT Finish: 2 years from the Effective Date of this Contract <br /> <br />Page 3 of 3 <br /> <br />~ " <br />
The URL can be used to link to this page
Your browser does not support the video tag.