My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150124 Contract
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
C150124 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2010 12:40:53 PM
Creation date
2/21/2008 3:28:24 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150124
Contractor Name
Shultz Farm, Inc.
Contract Type
Loan
Water District
0
County
Weld
Bill Number
MC3
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />disbursed by the CWCB to the BORROWER differs from the LOAN AMOUNT, the contract and <br />deed of trust shall be amended. <br /> <br />SECTION 6 - ADDITIONAL CONTRACT REQUIREMENTS <br />No additional contract requirements imposed by the CWCB. <br />SECTION 7 - CONSTRUCTION FUND PROGRAM PROCEDURES <br />A. The BORROWER shall employ an engineer, registered in the state of Colorado to prepare <br />plans and specifications for the PROJECT. <br />B. The BORROWER'S and the Engineering Consultant's Agreements and the plans and <br />specifications must be submitted to the CWCB staff for verification of compliance with <br />the terms of this Contract when available prior to bidding. Any modifications to the <br />plans and specifications must be approved in writing by the CWCB staff. <br />C. For plans and specifications for all jurisdictional dams and reseNoirs, as defined by 9 <br />37-87-105 C.R.S., the BORROWER shall provide a letter of approval from the State <br />Engineer's Office prior to construction. <br />D. CWCB staff must be present at bidding and must approve the award of the construction <br />contract. <br />E. The BORROWER shall contract for the construction of the work with responsible and <br />capable Construction Firms, which said Construction Firms shall be selected by the <br />BORROWER and found acceptable by the CWCB staff. <br />F. The BORROWER must provide a copy of the executed construction contract documents <br />consisting of the contractor's proposal, construction contract, performance bond, <br />payment bond, notice of award, notice to proceed, sample change order, and sample <br />field order, as well as the advertisement for bid and bid bond at bidding. After the <br />CWCB staff verifies that these documents comply with the terms of this contract, the <br />BORROWER may issue the notice to proceed to the Construction Firms. <br />G. The BORROWER shall conduct a pre-construction conference at which time the CWCS <br />staff shall have the opportunity to review and approve the construction schedule. <br />H. If the CWCB staff determines that the PROJECT requires a resident inspector during <br />construction, the BORROWER shall employ an inspector who has been approved by the <br />CWCB staff. <br />I. The BORROWER shall construct the PROJECT in accordance with the approved plans and <br />specifications. <br />J. Upon completion of the PROJECT construction, the BORROWER shall provide as-built <br />drawings of the PROJECT to the CWCB staff, or, if required by 937-87-105, C.R.S., the <br />BORROWER shall provide the as-built drawings to the State Engineer's Office for <br />approval and filing. <br />K. Upon completion of the PROJECT construction, the BORROWER shall arrange a final <br />inspection for the CWCB staff. <br />L. The BORROWER shall pay all of the expenses related to the PROJECT when such bills are <br />due. <br /> <br />Page 2 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.