Laserfiche WebLink
<br />8. List any feasibility studies or other investigations that have been completed or are now <br />in progress for the proposed project. Please submit one copy of each completed study <br />with this application. <br /> <br />As of the date of this loan application, only limited investigations have been completed. <br />Field surveys have been performed to provide topographic contour mapping for <br />purposes of estimating reservoir capacities and for preliminary siting of the proposed <br />dam embankment. In progress are preliminary studies related to the hydrology of the <br />Little Muddy Creek drainage to evaluate the availability of water for the project. <br />Under se]Hll'ate cover, the Applicant is requesting fmancilll assistance for completion <br />of the required Feasibility Report. <br /> <br />A required for this application, a preliminary estimate of the probable construction <br />costs has been prepared by Applicant's engineer. This estimate is based on a <br />preliminary conceptu'" design of the dam and appurtenances as described above. <br /> <br />9. Estimated cost of the project. Please include estimated engineering costs, and estimated <br />construction costs, ifknown. (See Table) <br /> <br />Estimated Engineering Costs: $ 124,500 <br /> <br />Estimated Construction Costs: $ 776,480 <br /> <br />Estimated Total Costs: $ 900,980 <br /> <br />10. Loan amount and tenns you are requesting. <br />Requested Loan Amount:$ 675,735 (Usually 75% of Estimated Total ~) <br />Term (length) ofloan: 20 Yeats (Usually 10, 20, or 30 years) <br />Interest Rate: Cu"ent Rate on 20 Year Loan % (please call for our current rates) <br /> <br />Part C. - Project Sponsor Financial Information <br /> <br />Because the CWCB Construction Fund is a revolving fund, it is important that the project <br />sponsor have the financial capacity to repay any loans made by the CWCB. The following <br />information is needed to assist the CWCB in a preliminary assessment of the applicant's <br />financial capacity. It is also requested that the project sponsor submit with this application <br />copies of the two most reeent annual reports, financial statements, corporate reports or <br />other Cl1lTent documentation of financial condition and operations. <br /> <br />1. List any existing liability or indebtedness that exceeds one thousand dollars. For <br />example, bank loans, government agency loans, bond issues, accounts payable, etc. <br />Include names and addresses of lenders, amounts, due dates and maturity dates. <br />Attach a separate schedule, if needed. (SEE BALANCE SHEETS) <br /> <br />The.first liability shown on the balance sheets is owed to Mike Miniat, the principle <br />member. The second liability is "inter-company" debt, in other words, loaned to <br />Sylvan by other entities owned by Mike Mmiat, principaDy W"d/iams Peak R/lnch. <br />