My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ01898 (2)
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
PROJ01898 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:22:25 AM
Creation date
2/21/2008 2:45:34 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153700
Contractor Name
Norwood, Town of and Norwood Water Commission
Contract Type
Loan
Water District
60
County
San Miguel
Bill Number
HB 93-1273
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />" <br /> <br />If <br />! <br />if <br /> <br />I <br /> <br />il .1 <br />I <br />:, <br /> <br />I <br /> <br />:~ <br />~I <br />I I <br />I I <br />, I' <br />'I <br />:\ <br /> <br />I <br /> <br />I <br />-r <br />I <br />, r <br />I <br />- r <br />I <br />I . <br /> <br />J q q ( <br /> <br />TABLE VII-A <br /> <br />~fovf- <br /> <br />SUMMARY OF TOTAL SYSTEM COSTS <br /> <br />~ Water System <br /> <br />General Improvements-Res.& piping <br />Flow Measurement System <br />New Water Well <br />Additional.Farmer's Shares <br />*Domestic Pipeline - 6" DIP <br /> <br />Subtotal <br /> <br />Water Treatment System <br /> <br />Gravity Filter System <br />upgrade Other Treatmt.Units <br />Miscellaneous Improvements <br /> <br />Subtotal <br /> <br />Distribution System (Priority I) <br /> <br />Renovate Old storage Tank <br />piping & Tank Improvements <br />New Supply Line-Tank #2to Town <br />New Supply Line-plant to Tank #2 <br /> <br />subtotal <br /> <br />Total Construction Costs <br /> <br />Engineering, Legal (15%) <br /> <br />Total All Costs <br /> <br />Total <br /> <br />$14/400 <br />10,100 <br />52,000 <br />60/000 <br />327/200 <br /> <br />$463,700 <br /> <br />$135,600 <br />15/600 <br />8,500 <br /> <br />$159,700 <br /> <br />$53,000 <br />44/900 <br />232,800 <br />214,700 <br /> <br />$545,400 <br /> <br />$1,168,900 <br /> <br />175,300 <br /> <br />$1,344/200 <br /> <br />Alt. TA <br /> <br />$14,400 <br />10/100 <br />52,000 <br />60/000 <br />327,200 <br /> <br />$463,700 <br /> <br />$135,600 <br />15/600 <br />8,500 <br /> <br />$159,700 <br /> <br />$53,000 <br />44/900 <br /> <br />$ 97,900 <br /> <br />$721/300 <br /> <br />108,200 <br />$829/500 <br /> <br />Alt.TB <br /> <br />$14/400 <br />10,100 <br /> <br />c:n~- <br /> <br />j <br /> <br />$84,500 <br /> <br />$13~i/600 <br />1~3/600 <br />~3, 500 <br /> <br />$159/700 <br /> <br />$53,000 <br />44,900 <br />2:3-~ <br /> <br />$330,700 <br /> <br />$ :,74,900 <br /> <br />86,200 <br /> <br />$ 661/100 <br /> <br />*Cost of pipeline assumes a hydroelectric plant is built, 'which <br />assists in payback (See Table IV-J) <br /> <br />I I <br />-' <br /> <br />, ":l ~ ., <br />
The URL can be used to link to this page
Your browser does not support the video tag.