Laserfiche WebLink
<br />I <br />l <br />", <br />il <br />1 <br />II <br />I~ <br />II <br />l~ <br />I <br /> <br /> <br />", <br /> <br />I] <br />r <br /> <br />r~ <br /> <br />!I <br />f <br />=-1", <br />i~ <br />-I "I <br />r <br />I~ <br />:.1 <br />r <br />- I~ <br /> <br />I . <br /> <br />'1: <br /> <br />) <br /> <br />19q/ <br /> <br />~efO~+- <br /> <br />TABLE IV-F <br /> <br />CONSTRUCTION COSTS <br /> <br />PIPELINE: GURLEY RESERVOIR TO TOWN RESERVOIR <br /> <br />Description <br /> <br />Q.iY..:- lli:1.ll. <br /> <br />Unit <br />~ <br /> <br />~!}!. <br /> <br />~ DOMESTIC WATER DUCTILE IRON PIPE (PRESSURE) SYSTEM <br /> <br />1. <br /> <br />2. <br /> <br />3. <br /> <br />4 . <br /> <br />6" Ductile Iron Pipe <br /> <br />Clearing & AccesS Roads <br /> <br />ROW Acquisition <br /> <br />611 BF Valves <br /> <br />24,000 L.F. <br /> <br />14.00 336,000 <br /> <br />1 L.S. 10,000 <br /> <br />1 L.S. 10,000 <br />10 Ea . 9 00 <br /> <br />Subtotal <br />20% contingency <br />Total <br />With Gurley Connection <br /> <br />h <br />1. <br /> <br />DOMESTIC WATER - ~ (NON-PRESSURE) SYSTEM <br /> <br />611 PVC Pipe <br /> <br />2. <br /> <br />Clearing & Access Road <br /> <br />3 . <br /> <br />ROW Acquisition <br /> <br />4 . <br /> <br />611 stand Pipes <br /> <br />10,000 <br /> <br />10,000 <br /> <br />~)OO <br /> <br />$365,000 <br />lhIQQ. <br />$438,000 <br />$ 4 4 5 , 2 0 01 <br /> <br />24,000 L.F. 12.00 288,000 <br /> 1 L.S. 10,000 10.,000 <br /> 1 L.S. 10,000 10,000 <br /> 10 Ea. 500 2..&Q.Q. <br /> Subtotal $313,000 <br />20% Contingency 62,600 <br /> Total $37:1,600 <br />With Gurley Tie-In' $382,600 <br /> .u_ <br /> <br />60a <br />