Laserfiche WebLink
<br />lq <br /> <br /> <br />., <br /> <br />TABLE V-A <br /> <br />COST E$TlMATE <br /> <br /> <br />Item Unit Extended <br />lio. Description ~ unit cost cost <br />PIPELINE = GURLEY RESERVOIR IQ. TOWN RESERVOIR <br />1. 611 DIP pipe, 3 ft. deep 24,000 L.F. 16.00 $384,000 <br />2. Clearing/Access Road 24,000 L.F. 2.00 48,000 <br />3. ROW Acquisition 27 AC. 1,000 27,000 <br />4. Air Relief pipes 25 Ea. 600 15,000 <br />5. Rock Excavation (Ripping) 6,000 L.F. 3.00 18.000 <br /> subtotal pipeline - $492,000 <br /> <br />. <br />6 IN. DIP _ GURLEY RESERVOIR TO TOWN RESERVOIR <br /> <br />, <br />$> <br /> <br />l{ <br /> <br />t <br />i' <br />i <br />i <br />. <br /> <br />i It <br />. 1. <br />, , <br />; <br />. <br />il <br />\ <br />i.,t <br />l- . <br />t <br />, <br /> <br />INTAKE AT GURLEY RESERVOIR <br /> <br />1 L.S. <br /> <br />$ 60,000 <br /> <br />\, <br />~1" <br />I" <br />t <br />\ <br />"- <br />It <br /> <br />41. <br /> <br />Intake structure w/pump <br /> <br />1 L.S. <br /> <br />25.000 <br /> <br />2. <br /> <br />control system <br /> <br />subtotal Intake - $85,000 <br /> <br />combined Subtotal construction <br />20% construction contingency <br />Total construction <br />20% Engineering <br />Total <br /> <br />$577,000 <br />115.400 <br />$692,400 <br />138.500 <br />$830,900 <br /> <br /> <br />. <br />I' <br />\ <br />,- <br />I <br />I <br /> <br />) <br />