My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ01898 (2)
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
PROJ01898 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:22:25 AM
Creation date
2/21/2008 2:45:34 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153700
Contractor Name
Norwood, Town of and Norwood Water Commission
Contract Type
Loan
Water District
60
County
San Miguel
Bill Number
HB 93-1273
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />lq <br /> <br /> <br />., <br /> <br />TABLE V-A <br /> <br />COST E$TlMATE <br /> <br /> <br />Item Unit Extended <br />lio. Description ~ unit cost cost <br />PIPELINE = GURLEY RESERVOIR IQ. TOWN RESERVOIR <br />1. 611 DIP pipe, 3 ft. deep 24,000 L.F. 16.00 $384,000 <br />2. Clearing/Access Road 24,000 L.F. 2.00 48,000 <br />3. ROW Acquisition 27 AC. 1,000 27,000 <br />4. Air Relief pipes 25 Ea. 600 15,000 <br />5. Rock Excavation (Ripping) 6,000 L.F. 3.00 18.000 <br /> subtotal pipeline - $492,000 <br /> <br />. <br />6 IN. DIP _ GURLEY RESERVOIR TO TOWN RESERVOIR <br /> <br />, <br />$> <br /> <br />l{ <br /> <br />t <br />i' <br />i <br />i <br />. <br /> <br />i It <br />. 1. <br />, , <br />; <br />. <br />il <br />\ <br />i.,t <br />l- . <br />t <br />, <br /> <br />INTAKE AT GURLEY RESERVOIR <br /> <br />1 L.S. <br /> <br />$ 60,000 <br /> <br />\, <br />~1" <br />I" <br />t <br />\ <br />"- <br />It <br /> <br />41. <br /> <br />Intake structure w/pump <br /> <br />1 L.S. <br /> <br />25.000 <br /> <br />2. <br /> <br />control system <br /> <br />subtotal Intake - $85,000 <br /> <br />combined Subtotal construction <br />20% construction contingency <br />Total construction <br />20% Engineering <br />Total <br /> <br />$577,000 <br />115.400 <br />$692,400 <br />138.500 <br />$830,900 <br /> <br /> <br />. <br />I' <br />\ <br />,- <br />I <br />I <br /> <br />) <br />
The URL can be used to link to this page
Your browser does not support the video tag.