Laserfiche WebLink
<br />I <br /> <br />6. Will the acquisition of 'additional water rights be <br />necessary? <br /> <br />It is planned for in the near future. <br /> <br />7. Please list the names and addresses of any technical or <br />legal consultants retained to represent the applicant or to <br />conduct investigations for the proposed project: <br /> <br />William D. Ham~.nn, P.E. <br />Westwater Engineering <br />Consulting Engineers <br />P.O. Box 1470 <br />Palisade, Colorado 81526 <br /> <br />8. List any feasibility studies or other investigations which <br /> <br />have been completed or are now in progress for the proposed <br /> <br />project. (Please submit one copy of each completed study <br /> <br />with this application): <br /> <br />Preliminary Engineering Report <br />Evaluation of Water Supply System <br />Prepared for Town of Norwood & <br />San Miguel Water Conservancy District <br /> <br />-N9vember 1991- <br /> <br />9. Estimated cost of the project, if known: <br /> <br />General Improvements-Reservoir & piping---$ 14,400 <br />Flow Measurement System-------------------$ 10,100 <br />Domestic Pipe1ine--8" DIP-----------------$327,200 <br /> <br />Total Cost <br /> <br />. <br />$351,700 <br /> <br />A-4 <br />