My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ01894 (2)
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
PROJ01894 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2011 11:00:23 AM
Creation date
2/21/2008 2:40:13 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150030
Contractor Name
Silt Water Conservancy District
Contract Type
Loan
Water District
39
County
Garfield
Bill Number
SPL
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />i. <br /> <br />JAN-14-03 TUE 09:40 AM WESTERN AREA POWER ADMIN FAX NO. 8704617420 <br /> <br />" <br /> <br />Silt Substation Rebuild to 115kV <br />Includes both transformers assuming tho pumps <br />are also replaced. <br /> <br />Estimate prepared on January 14, 2003 <br /> <br />Option 1 <br />115/69 - 13. 8-kV, 1 ,500kV A transformer <br />13.8kV. 2.4-kV/480 volt 1 ,500kVA transformer <br />3 115-kV \Ina structures <br />Other work <br /> <br />Construction Contract Total <br /> <br />$176,000 <br />$35,000 <br />$50,000 <br />$106.000 <br />$367.000 <br /> <br />Planning <br />Environment/lands <br />Design <br />Inspection <br />Construction Mgmt <br />Commissioni~ <br /> <br />$10,000 <br />$5,000 <br />$44.000 <br />$20,000 <br />$20,000 <br />1?5.J000 <br />labor Subtotal $124,000 <br /> <br />Project Total $491,000 <br />Contingency 10% <br />TOTAL ESTIMATED COST $540,100 <br /> <br />APPENDIX B <br /> <br />P, 02 <br />
The URL can be used to link to this page
Your browser does not support the video tag.