<br />i. <br /> <br />JAN-14-03 TUE 09:40 AM WESTERN AREA POWER ADMIN FAX NO. 8704617420 <br /> <br />" <br /> <br />Silt Substation Rebuild to 115kV <br />Includes both transformers assuming tho pumps <br />are also replaced. <br /> <br />Estimate prepared on January 14, 2003 <br /> <br />Option 1 <br />115/69 - 13. 8-kV, 1 ,500kV A transformer <br />13.8kV. 2.4-kV/480 volt 1 ,500kVA transformer <br />3 115-kV \Ina structures <br />Other work <br /> <br />Construction Contract Total <br /> <br />$176,000 <br />$35,000 <br />$50,000 <br />$106.000 <br />$367.000 <br /> <br />Planning <br />Environment/lands <br />Design <br />Inspection <br />Construction Mgmt <br />Commissioni~ <br /> <br />$10,000 <br />$5,000 <br />$44.000 <br />$20,000 <br />$20,000 <br />1?5.J000 <br />labor Subtotal $124,000 <br /> <br />Project Total $491,000 <br />Contingency 10% <br />TOTAL ESTIMATED COST $540,100 <br /> <br />APPENDIX B <br /> <br />P, 02 <br />