Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />SELECTED ALTERNATIVE <br /> <br />The Larimer & Weld Irrigation Company has chosen Alternative 3 as the desired alternative. The <br />Company does not feel the other two alternatives provide for an increase in the efficiency of their <br />system as does Alternative 3. Alternative 3 allows them to operate in divisions if need be; <br />provides for more control of the ditch as far as head and flow; increases safety to the ditch riders <br />by eliminating stoplogs; and, decreases cost of operation by reducing manpower. The new <br />structures would be expected to require little maintenance over the life of the loan and would have <br />a longl~r life span than the repaired structures outlined in Alternative 2. <br /> <br />PROJECT COST <br /> <br />The opinion of cost of construction of the checks is listed in the previous section in Table 3. <br />Following is a summary of all project costs including engineering fees and contingencies. <br /> <br />TOTAL <br /> <br />Estimated Cost <br />$ 1,054,600 <br />$ 126,552 <br />$ 105.460 <br />$ 1,286,612 <br /> <br />Item <br />1. Construction Costs <br />2. Engineering Fees @ 12% <br />3. Contingency @ 10 % <br /> <br />The Larimer & Weld Irrigation Company is seeking funding through the Colorado Water <br />Conservation Board" Small Projects Fund" to finance $1,000,000 of the project. The irrigation <br />Company will fund the remaining amount through an increase in assessments and/or a short term <br />loan through a private institution. <br /> <br />FUND REQUIREMENT SCHEDULE <br /> <br />The expected fund requirement schedule for the project, with an estimated project total cost of <br />$1,286,612 is as shown below. This schedule is based on construction starting late summer 2002 <br />and being completed by the spring of 2003. <br /> <br />The Fund Requirement Schedule shows the funds required by the Company and the CWCB to <br />complete the project on the schedule shown. <br /> <br /> <br />2002 <br />2003 <br /> <br />$ 143,306 <br />$ 143,306 <br /> <br />$ 700,000 <br />$ 300,000 <br /> <br />Larimer & Weld Feasibility Study <br /> <br />Page 12 <br />