<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />
<br />TABLE 3
<br />REPLACEMENTCHECKSTRUCTURES~ARY
<br />
<br />Chec:k Name Location Width Height Estimated Cost
<br />Finley NE 1/4, Sec 34, T7N, R67W 25' 9' $ 125,000
<br />Hurrich NW 1/4, Sec. 29, T7N, R66W 22' 9' $ 115,000
<br />Montgomery NE 1/4, Sec. 34, T7N, R66W 22' 8' $ 115,000
<br />Loefner SW 1/4, Sec. 22, T7N, R66W 21 ' 8' $ 108,000
<br />Magnuson SE 1/4, Sec. 22, T7N, R66W 20' 8' $ 102,000
<br />Town Boyd NW 1/4, Sec. 23, T7N, R66W 18' 8' $ 91,800
<br />West 85 NW 1/4, Sec.24, T7N, R66W 17' 8' $ 86,700
<br />East 85 NW 1/4, Sec. 24, T7N, R66W 17' 9' $ 86,700
<br />Clark SE 1/4, Sec.18, T7N, R65W 16' 7' $ 81,600
<br />Walpole NE 1/4, Sec. 9, T7N, R65W 14' 7' $ 71 ,400
<br />Last NW 1/4, Sec. 10, T7N, R66W 14' 7' $ 71,400
<br /> TOTAL I $ 1,054,600
<br />
<br />1. See map in Appendix B for location of checks and photographs of existing checks in Appendix A.
<br />2. Costs noted are an Opinion of the Cost expected and are not intended to be construed as the exact cost of construction.
<br />
<br />TABLE 4
<br />CONSTRUCTION COSTS OF CHECKS COMPLETED IN 2002
<br />
<br />ITEIVl TOTAL COST
<br /> 22' GATE 20' GATE 18' GATE
<br />1. Concrete $ 51,000 $ 48,000 $ 40,000
<br />2. Demolition $ 6,000 $ 5,000 $ 5,000
<br />3. Earthwork/Riprap $ 15,000 $ 11 ,000 $ 8,000
<br />4. Obermeyer Gates $ 38,000 $ 35,000 $ 31,000
<br />TOTAL $ 110,000 $ 99,000 $ 84,000
<br />COST PER FOOT GATE $ 5,000 $ 4,950 $ 4,667
<br />
<br />Larimer & Weld Feasibility Study
<br />
<br />Page II
<br />
|