Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />TABLE 3 <br />REPLACEMENTCHECKSTRUCTURES~ARY <br /> <br />Chec:k Name Location Width Height Estimated Cost <br />Finley NE 1/4, Sec 34, T7N, R67W 25' 9' $ 125,000 <br />Hurrich NW 1/4, Sec. 29, T7N, R66W 22' 9' $ 115,000 <br />Montgomery NE 1/4, Sec. 34, T7N, R66W 22' 8' $ 115,000 <br />Loefner SW 1/4, Sec. 22, T7N, R66W 21 ' 8' $ 108,000 <br />Magnuson SE 1/4, Sec. 22, T7N, R66W 20' 8' $ 102,000 <br />Town Boyd NW 1/4, Sec. 23, T7N, R66W 18' 8' $ 91,800 <br />West 85 NW 1/4, Sec.24, T7N, R66W 17' 8' $ 86,700 <br />East 85 NW 1/4, Sec. 24, T7N, R66W 17' 9' $ 86,700 <br />Clark SE 1/4, Sec.18, T7N, R65W 16' 7' $ 81,600 <br />Walpole NE 1/4, Sec. 9, T7N, R65W 14' 7' $ 71 ,400 <br />Last NW 1/4, Sec. 10, T7N, R66W 14' 7' $ 71,400 <br /> TOTAL I $ 1,054,600 <br /> <br />1. See map in Appendix B for location of checks and photographs of existing checks in Appendix A. <br />2. Costs noted are an Opinion of the Cost expected and are not intended to be construed as the exact cost of construction. <br /> <br />TABLE 4 <br />CONSTRUCTION COSTS OF CHECKS COMPLETED IN 2002 <br /> <br />ITEIVl TOTAL COST <br /> 22' GATE 20' GATE 18' GATE <br />1. Concrete $ 51,000 $ 48,000 $ 40,000 <br />2. Demolition $ 6,000 $ 5,000 $ 5,000 <br />3. Earthwork/Riprap $ 15,000 $ 11 ,000 $ 8,000 <br />4. Obermeyer Gates $ 38,000 $ 35,000 $ 31,000 <br />TOTAL $ 110,000 $ 99,000 $ 84,000 <br />COST PER FOOT GATE $ 5,000 $ 4,950 $ 4,667 <br /> <br />Larimer & Weld Feasibility Study <br /> <br />Page II <br />