Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I. <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br /> I QUANTITY UNIT <br />ITEM DESCRIPTION UNITS PRICE AMOUNT <br />7. West 85 Check <br /> a. Demolition 1.00 L.S. $5,000 $5,000 <br /> b. Concrete 30.00 C.Y. $650 $19,500 <br /> c. ExcavationlBackfill 250.00 C.Y. $16 $4,000 <br /> d. Riprap 200.00 TONS $25 $5,000 <br /> $33,500 <br />8. East 85 Check <br /> a. Demolition 1.00 L.S. $5,000 $5,000 <br /> b. Concrete 50.00 C.Y. $650 $32,500 <br /> c. ExcavationlBackfill 250.00 C.Y. $16 $4,000 <br /> d. Riprap 400.00 TONS $25 $10,000 <br /> $51,500 <br />9. Clark Check <br /> a. Demolition 1.00 L.S. $8,000 $8,000 <br /> b. Concrete 30.00 C.Y. $650 $19,500 <br /> c. ExcavationlBackfill 250.00 C.Y. $16 $4,000 <br /> d. Riprap 200.00 TONS $25 $5,000 <br /> $36,500 <br />10. Tatayama Check 1.00 L.S. $0 $0 <br />11. Walpole Check <br /> a. Demolition 1.00 L.S. $5,000 $5,000 <br /> b. Concrete 30.00 c.Y. . $650 $19,500 <br /> c. ExcavationlBackfill 200.00 C.Y. $16 $3,200 <br /> d. Riprap 200.00 TONS $25 $5,000 <br /> $32,700 <br />12. Last Check <br /> a. Demolition 1.00 L.S. $4,000 $4,000 <br /> b. Concrete 30.00 C.Y. $650 $19,500 <br /> c. ExcavationlBackfill 200.00 c.Y, $16 $3,200 <br /> d. Riprap 200.00 TONS $25 $5,000 <br /> $31,700 <br />TOTAL THIS TABLE $185,900 <br />TOTAL TABLES 2 & 2a $487,125 <br /> <br />TABLE2a <br />COST ESTIMATE <br />LARIMER & WELD DITCH <br />Alternative No.2 - Repair Structures <br />