My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150109 Feasibility Study
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
C150109 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2011 9:47:21 AM
Creation date
2/21/2008 2:17:00 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150109
Contractor Name
Larimer and Weld Irrigation Company, The
Contract Type
Loan
Water District
2
County
Weld
Bill Number
MC3
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I. <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br /> I QUANTITY UNIT <br />ITEM DESCRIPTION UNITS PRICE AMOUNT <br />7. West 85 Check <br /> a. Demolition 1.00 L.S. $5,000 $5,000 <br /> b. Concrete 30.00 C.Y. $650 $19,500 <br /> c. ExcavationlBackfill 250.00 C.Y. $16 $4,000 <br /> d. Riprap 200.00 TONS $25 $5,000 <br /> $33,500 <br />8. East 85 Check <br /> a. Demolition 1.00 L.S. $5,000 $5,000 <br /> b. Concrete 50.00 C.Y. $650 $32,500 <br /> c. ExcavationlBackfill 250.00 C.Y. $16 $4,000 <br /> d. Riprap 400.00 TONS $25 $10,000 <br /> $51,500 <br />9. Clark Check <br /> a. Demolition 1.00 L.S. $8,000 $8,000 <br /> b. Concrete 30.00 C.Y. $650 $19,500 <br /> c. ExcavationlBackfill 250.00 C.Y. $16 $4,000 <br /> d. Riprap 200.00 TONS $25 $5,000 <br /> $36,500 <br />10. Tatayama Check 1.00 L.S. $0 $0 <br />11. Walpole Check <br /> a. Demolition 1.00 L.S. $5,000 $5,000 <br /> b. Concrete 30.00 c.Y. . $650 $19,500 <br /> c. ExcavationlBackfill 200.00 C.Y. $16 $3,200 <br /> d. Riprap 200.00 TONS $25 $5,000 <br /> $32,700 <br />12. Last Check <br /> a. Demolition 1.00 L.S. $4,000 $4,000 <br /> b. Concrete 30.00 C.Y. $650 $19,500 <br /> c. ExcavationlBackfill 200.00 c.Y, $16 $3,200 <br /> d. Riprap 200.00 TONS $25 $5,000 <br /> $31,700 <br />TOTAL THIS TABLE $185,900 <br />TOTAL TABLES 2 & 2a $487,125 <br /> <br />TABLE2a <br />COST ESTIMATE <br />LARIMER & WELD DITCH <br />Alternative No.2 - Repair Structures <br />
The URL can be used to link to this page
Your browser does not support the video tag.