Laserfiche WebLink
<br />.1 <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br /> IQUANTITY IUNITS I UNIT [ AMOUNT <br />ITEM DESCRlPTION PRlCE <br />1. Findley Check <br /> a. Concrete 20.00 C.Y. $650 $13,000 <br /> b. Riprap 250.00 TONS $25 $6,250 <br /> $19,250 <br />2. Hurrich Check - from Table 3 1.00 L.S. $115,000 $115,000 <br />3. Montgomery <br /> a. Demolition 1.00 L.S. $8,000 $8,000 <br /> b. Concrete 45.00 C.Y. $650 $29,250 <br /> c. Excavation/Backfill 650.00 C.Y. $16 $10,400 <br /> d. Riprap 250.00 TONS $25 $6,250 <br /> $53,900 <br />4. Loeffler Check <br /> a. Demolition 1.00 L.S. $5,000 $5,000 <br /> b. Concrete 35.00 C.Y. $650 $22,750 <br /> c. Excavation/Backfill 450.00 C.Y. $16 $7,200 <br /> d. Riprap 250.00 TONS $25 $6,250 <br /> $41,200 <br />5. Magnuson Check <br /> a. Demolition 1.00 L.S. $5,000 $5,000 <br /> b. Concrete 40.00 C.Y. $650 $26,000 <br /> c. Excavation/Backfill 300.00 C.Y. $16 $4,800 <br /> d. Riprap 175.00 TONS $25 $4,375 <br /> $40,175 <br />6. Town Boyd Check <br /> a. Demolition 1.00 L.S. $4,000 $4,000 <br /> b. Concrete 30.00 C.Y. $650 $19,500 <br /> c. Excavation/Backfill 200.00 C.Y. $16 $3,200 <br /> d. Riprap 200.00 TONS $25 $5,000 <br />, $31,700 <br />TOTAL THIS TABLE $301,225 <br /> <br />TABLE 2 <br />COST ESTIMATE <br />LARIMER & WELD DITCH <br />Alternative No.2 - Repair Structures <br />