Laserfiche WebLink
<br />Lower Platte and Beaver Canal Company <br />February 3, 2004 <br /> <br />Page 2 <br /> <br />c) You must adhere to the CWCS Desion and Construction Administration Procedures. <br />Tim Feehan will contact you regarding the CWCS requirements concerning project <br />bidding, design, and construction. Tim will make construction inspections, which will be <br />the basis of the monthly pay estimates for disbursement of your loan funds. <br /> <br />On behalf of the Soard, I would like to thank you for applying for a loan from the Colorado <br />Water Conservation Soard. <br /> <br />SincE~rey,. . __ ~. <br />~?~~4T <br /> <br />~ Serlet, PE, Chief <br />Water Supply Planning and Finance Section <br />Colorado Water Conservation Soard <br /> <br />Attachments: <br /> <br />Updated Memo: LPBCC 104 memo <br /> <br />cc (w/Attachment 1.): <br /> <br />Mr. Eric Wilkinson, Board Member, Colorado Water Conservation Board <br />CWCB Section B Staff <br />Linda Bassi, AGO <br />Chrono File <br /> <br />C: Projects\Proj-New\LPBCC 104 Ltr <br />