My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ01880
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
PROJ01880
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2011 2:54:12 PM
Creation date
2/21/2008 1:44:49 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150165
Contractor Name
Lower Platte and Beaver Canal Company
Contract Type
Loan
Water District
1
County
Morgan
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />..:tV 5 <br /> <br />STA~rE OF COLORADO <br /> <br />Colorado Water Conservation Board <br /> <br />Department of Natural Resources <br />1313 Sherman Street, Room 721 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3441 <br />FAX: (303) 866-4474 <br />www.cwcb.state.co.us <br /> <br /> <br />Bill Owens <br />Governor <br /> <br />February 3, 2004 <br /> <br />Russell George <br />Executive Director <br /> <br />Rod Kuharich <br />CWCB Director <br /> <br />Mr. J. Robert Tuck, President <br />Lower Platte and Beaver Canal Co. <br />P.O. Box 190 <br />Hillrose, CO 80733-0190 <br /> <br />RE: Well Augmentation Project <br />L.oan Approval <br /> <br />Dan McAuliffe <br />Deputy Director <br /> <br />Dear Robert, <br /> <br />I am pleased to inform you that the Colorado Water Conservation Board (CWCB) has <br />approved your request for a loan from the Construction Fund. We understand the loan will <br />be used to construct a well augmentation and groundwater recharge project. <br /> <br />The Board approved a Small Project loan from the Construction Fund in an amount of <br />$313,605 at the loan terms of 2.5% for 30 years. The approval includes the provision for a <br />1 % loan service fee, which will be funded from the loan proceeds. I have attached a copy <br />of the updated Board memo concerning the L.ower Platte and Beaver Canal Company. <br />Please refer to page 4 of that memo and to the section "Action taken by the CWCB <br />January 27,2004." <br /> <br />When the Board approves a loan there remain several conditions: <br /> <br />a) A Feasibilitv Study is reauired. John Van Sciver has reviewed the study titled <br />"Feasibility of Construction of the Lowor Platte and Beaver Canal Company <br />Augmentation Project" prepared by Brent Nation, P.E. The report meets the <br />requirements of the CWCB Construction Fund Guidelines for feasibility studies, and <br />has been accepted. <br /> <br />b) An approved contract must be in place before funds can be advanced. Jan IIlian has <br />placed this project on our "hot list" and has started the loan contracting process with a <br />goal of having a signed contract in place as soon as possible. Once the contract is <br />finalized the Company may request loan funds to cover eligible project expenditures. <br />
The URL can be used to link to this page
Your browser does not support the video tag.