My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Basin States' Comments on Draft Environmental Impact Statement, CO River Interim guidelines for Lower Basin Shrotages and Coordinated Operations for Lake Powell and Lake Mead
CWCB
>
Publications
>
DayForward
>
Basin States' Comments on Draft Environmental Impact Statement, CO River Interim guidelines for Lower Basin Shrotages and Coordinated Operations for Lake Powell and Lake Mead
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2010 8:58:15 AM
Creation date
2/4/2008 10:42:58 AM
Metadata
Fields
Template:
Publications
Year
2007
Title
Basin States' Comments on Draft Environmental Impact Statement, CO River Interim guidelines for Lower Basin Shrotages and Coordinated Operations for Lake Powell and Lake Mead
CWCB Section
Interstate & Federal
Description
Basin States' Comments on Draft Environmental Impact Statement, CO River Interim guidelines for Lower Basin Shrotages and Coordinated Operations for Lake Powell and Lake Mead
Publications - Doc Type
Other
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Account on December 31, 2025, may be released as provided herein until December 31, <br />2035. <br />1.3 Extended Term for Tributary Conservation ICS and Imported ICS. <br />Notwithstanding Article 1.2, the provisions of this Forbearance Agreement for creation, and <br />release in the Year of creation, of Tributary Conservation ICS under Article 2.2 and Imported <br />ICS under Article 2.4, shall continue in full force and effect after termination of this <br />Forbearance Agreement until the earlier of (1) the termination of the period provided in the <br />ROD for the creation, release, and use of Tributary Conservation ICS and Imported ICS, or <br />(2) fifty years from the date of execution of this Forbearance Agreement. The amount of <br />Tributary Conservation ICS and Imported ICS that may be created, released, and used <br />through the end of the extended term provided by this Article 1.3 shall not exceed the amount <br />shown in, and shall be consistent with, the attached Exhibits and for Tributary <br />Conservation ICS and Imported ICS. Such ICS may be released during the extended term as <br />provided herein. The obligations of the Parties under Articles 2.5, 2.6, 3, 4, and 5 shall <br />continue with regard to such ICS. <br />1.4 Seven Colorado River Basin States' Agreement <br />Notwithstanding Articles 1.2 and 1.3 above, if one or more states withdraw from the <br />agreement dated ,executed by the seven Colorado River Basin states, the Parties to this <br />Forbearance Agreement shall consult to determine whether to continue this Forbearance <br />Agreement in effect or to amend or terminate this Forbearance Agreement. In such event, <br />the teens of this Forbearance Agreement shall continue in effect until the Parties have <br />consulted and agreed to continue, amend, or terminate this Forbearance Agreement. In the <br />event of termination, all Parties shall be relieved from the terms hereof and this Forbearance <br />Agreement shall be of no further force or effect. <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.