My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP12634
CWCB
>
Water Supply Protection
>
DayForward
>
1001-2000
>
WSP12634
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 4:18:47 PM
Creation date
1/18/2008 2:42:52 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.105.H
Description
Water Projects - Navajo - Operation Studies
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
10/1/1998
Author
DOI-BOR
Title
Outlet Works Discharge Capacities - Navajo Dam - CRSP - Colorado-New Mexico - Technical Memorandum Number Nav-8130-TM-98-1 - DOI-BOR - 10-01-98
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />001701 <br /> <br />Ring-follower Gates <br /> <br />. Perfolrm interior inspection after: <br /> <br />5 days of operation in a single valve operated above 1600 c.f.s <br />... The 5 day requirement should be expected to change with <br />information gained during operations and subsequent inspections. <br />Detailed records of flowrates and the time the gate was exposed <br />should be kept for for the inspection <br /> <br />Yearly for flows less than 1600 c.f.s. <br />... Perform interior inspection early enough before spring startup to <br />effect repairs if necessary. <br /> <br />Weekly inspection of the hanger and gate's position. <br />... The weekly requirement should be expected to change with <br />information gained during operations and subsequent inspections <br />This requires observation from the valve house only. <br /> <br />. Inspection requires closure and lockout of 6-foot by 13-foot gate and <br />draining of the penstock. <br /> <br />· Inspect.ion for interior <br />q> Jf damaged, plans should be made for immediate repair. <br />Cavitation will "jump" downstream and will multiply it's damage <br />rapidly. The valve's casting would be hard to replace and the more <br />welding required, the more likely casting cracking is to occur. <br />. Inspe,ct the cylinder operator, all packing, structural and hydraulic piping <br />integrity. Inspect the leaf connection to the stem. Operate the hanger. <br />. The gate's interior is difficult to access from the penstock because of the <br />pipe's steepness. <br /> <br />General ,. opics/11 O-inch Penstock <br /> <br />. Perfoll'm interior inspection of the Penstock after: <br /> <br />5 days of operation in a single hollow jet valve operated above 1600 <br />c.f.s <br />q> The 5 day requirement should be expected to change with <br />
The URL can be used to link to this page
Your browser does not support the video tag.