<br />- <br /> <br />The work is being conducted by a multi-disciplined team comprised of Omaha District <br />personnel, personnel from the Colorado Water Conservation Board (CWCB), and <br />personnel from the consultant hired for this project, Tetra Tech EC, Inc. (IT) of Denver <br />Colorado as shown on the following table. <br /> <br /> PRODUCT DELIVERY TEAM <br />NAME ORG TITLE PHONE E-MAIL <br />Eric Laux NWO- Project 402-221-7186 eric.a.laux@usace.armv.mil <br /> PM-AE Manager <br />Tom CWCB CWCB PM 303-866-4804 Tom.browning@state.co.us <br />Browning <br />Gary Tetra Tetra Tech 303-980-3546 gdrendel@ttfwi.com <br />Drendel Tech PM <br />Joe Busto CWCB CWCB Ass't 303-866-4807 ioe. busto@state.co.us <br /> PM <br />Gene Tetra Tetra Tech 303-980-3505 gene. weglinski@tetratech- <br />Weglinski Tech Staff ffx.com <br />Joel NWO- Hydrology 402-221-4580 ioel.d.knofczynski@usace.arm <br />Knofczynski ED-HE Engineer v.mil <br />Dan Pridal NWO- Hydraulic 402-221-4585 daniel. b.pridal@usace.army.mi <br /> ED-HD Engineer 1 <br />Jay Lincoln NWO- Hydraulic 402-221-3256 Jav. g.lincoln@usace.armv.mil <br /> ED-HA Engineer <br />David Jensen NOW- Water 402-221-4622 david.e. jensen{@usace.armv.mi <br /> ED-HA Quality 1 <br />Elizabeth NWO- Community 402-221-4474 elizabeth. b. peake@usace.army <br />Peake PM-AE Planner .mil <br />Eric Laux NWO- Env. 402-221-7186 eric.a.laux{@usace.armv.mil <br /> PM-AE Resource <br /> Specialist <br />Gene Sturm NWO- Economist 402-221-4629 gene.a.sturm@usace.army.mil <br /> PM-AE <br /> <br />3. CRITICAL ASSUMPTIONS AND CONSTRAINTS. <br />The study does not examine the potential for reallocation at the Bear Creek or Cherry <br />Creek projects. The study will, however, evaluate operations ofthese two projects in <br />conjunction with the potential for reallocation at Chatfield. Storage reallocation amounts <br />will not jeopardize the safety of the dam. If safe~y concerns are identified, implementable <br />solutions to resolve the concerns will be identified and incorporated into the study effort. <br />Since the study began, new requirements and delays in completing tasks have increased the <br />study costs and extended the scheduled completion dates. Failure to fully fund the study at <br />revised level will delay completion of the study. <br /> <br />5 <br /> <br /> <br />