My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PUB00152
CWCB
>
Publications
>
DayForward
>
PUB00152
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2011 11:19:47 AM
Creation date
1/18/2008 12:46:45 PM
Metadata
Fields
Template:
Publications
Year
2007
Title
Chatfield, Cherry Creek, and Bear Creek Colorado Reallocation Feasibility Study
CWCB Section
Administration
Author
US Army Coprs of Engineers
Description
Chatfield, Cherry Creek, and Bear Creek Colorado Reallocation Feasibility Study
Publications - Doc Type
Tech Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />9. Independent Technical Review. Because of the complexity of this study and the <br />possibility that the outcome of this study could result in a modification of Corps <br />criteria for developing the Inflow Design Flood, an Independent Technical <br />Review will be performed. At this time, it is anticipated that a 3-person panel will <br />be used to perform the review consisting of a representative from another Corps <br />District, a representative from another federal agency (i.e. NWS, USBR, etc), and <br />a representative from either a consulting firm or university. <br /> <br />Chatfield Antecedent Flood Study <br />TasklDescription Time (Davs) <br />1. Develop POR Natural Flows <br />Reservoir Storage database 10 <br />Diversion database 10 <br />Historical Flows 5 <br />Configure model 10 <br />Route POR flows 10 <br />Plot & Check Flows 5 <br />2. Volume Frequency ofNat Flows 5 <br />3. Volume FreQuencv of Historical Flows 3 <br />4. Historical Precip database 10 <br />Evaluate ratios of antecedent precip 20 <br />5. Monte Carlo simulation ofprecip 20 <br />6. Monte Carlo simulation of inflows 15 <br />7. Report Preparation 20 <br />8. Meetings & Coordination 10 <br />9.ITR 15 <br />Tota11abor days 168 <br />Daily labor rate $750 <br />Subtotal labor cost $126,000 <br />Supervision & Admin $19,000 <br />Travel & Per Diem $5,000 <br />Total Project Cost $150,000 <br /> <br /> <br />3 <br />