Laserfiche WebLink
<br /> <br />The Omaha District PM maintains overall direction of the reallocation study and the in- <br />house and contract efforts. A permanent project file for this study is maintained by the <br />PM at the Omaha District in accordance with current District policies. This record file <br />will include all formal correspondence, decision documents, and financial documents <br />relevant to the study in electronic and/or hard copy format, as applicable. <br /> <br />13. VALUE ENGINEERING MANAGEMENT. <br />Need currently being determined. <br /> <br />14. CLOSEOUT. <br />Section 808 provides the authority for the Secretary to implement the reallocation of <br />storage in Chatfield. Further reports to Congress are, therefore, not required. Upon <br />completion of the feasibility study, and if still warranted, the reallocation report will be <br />forwarded to HQUSACE for approval and the contracting instruments will be developed. <br /> <br />15. REAL ESTATE. <br />Need currently being determined. <br /> <br />16. APPROVALS. <br />This Project Management Plan was prepared and approved by the Product Delivery Team <br />and certified by the functional Technical Coordinators. <br /> <br /> <br /> PRODUCT DELIVERY TEAM APPROVAL <br />Name Organization SignaturelDate <br />Eric Laux CENWO-PM-AE <br />Tom Browning CWCB <br />Garv Drendel Tetra Tech <br />Joel Knofczvnski CENWO-ED-HE <br />Gary Lien CENWO-ED-HD <br />Rob Hallett CENWO-ED-HA <br />David Jensen CENWO-ED-HA <br />Elizabeth Peake CENWO-PM-AE <br /> <br />12 <br />