My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25
CWCB
>
Board Meetings
>
DayForward
>
1-1000
>
25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:37:37 PM
Creation date
1/18/2008 10:18:33 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
1/23/2008
Description
OWCDP Section - Town of Castle Rock - Synthetic Turf Project
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Castle Rock Synthetic Turf Project <br />Application for Water Efficiency Grant <br />Castle Rock and DCSD plan to fund the Synthetic Turf Project with the assistance of <br />potential grant monies from CWCS. Castle Rock will manage all project cash flow <br />including funds from the DCSD, potential grant ntoiues, and contractor fees, with <br />exception to the initial design that is being funded by DCSD. Section 4.2 provides <br />additional information on Castle Rock and DCSD's roles and responsibilities and <br />Section 6.0 details project expenses and funding. <br />Castle Rock and DCSD have a history of partnering. DCSD and Castle Rock currently <br />have an intergovenwtental agreement (IGA) to allow recreational activities facilitated <br />by Castle Rock to be held at various DCSD school sites when school is not in session. <br />Castle Rock plans to continue to work closely with DCSD and include the Elementary <br />School #45 Synthetic Turf Project in this agreement. This will enable Castle Rock- <br />sponsored events to be held at the Elementary School #45 field, enhancing usability of <br />the synthetic turf field as well as the overall recreational opportunities available to the <br />community. <br />4.2 Project Tasks <br />The following tasks outline the major actions needed to construct the Synthetic Turf <br />Project. The roles and responsibilities of each participant and deliverables for each <br />task are also provided. Table 4 at the end of this section outlines the specific <br />responsibilities, labor rates, and anticipated level of effort for all participants <br />involved. <br />Task 1 -Design <br />Purpose <br />This task includes the completion of the final design documents and construction <br />specifications for the Synthetic Turf Project. <br />Roles and Responsibilities <br />DCSD and Castle Rock will fund the design effort and has selected three firms to <br />design the Synthetic Turf Project including an architectural firm, civil engineering <br />company, and an irrigation specialist firm. These firms will coordinate design efforts <br />to ensure compatibility among the architectural, engineering, and irrigation <br />components of the final synthetic turf field design. The roles and responsibilities of <br />each firm include: <br />^ Design Concepts Landscape Architects -Develop the architectural design of the <br />Synthetic Turf Project, which will consist of the synthetic turf field layout and <br />major components of the field, surrounding landscape, and other architectural <br />features. <br />^ JVA Civil Engineers -Develop designs for the final grading, subsurface drainage, <br />and other features that require civil engineering expertise. JVA Civil Engineers will <br />also professionally stamp the engineering plans and work with the other teaming <br />firms in developing construction specifications. <br />13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.