The six water supply wells in the north system have a combined annual appropriation amount of <br />397 acre-feet per year (af/yr). Of the 397 of/yr, a total of 190 of/yr can be pumped from wells 4, <br />5, 6, and 7. Well #5 has historically supplied 60 of/yr, or approximately 30% of the allowable <br />190 of/yr from wells #4-7. Hence, it is critical to re-drill Well #5 to maintain an adequate water <br />supply system for Bennett. <br />Project Description <br />The purpose of this project is to re-drill Well #5 so that Bennett can continue providing reliable <br />and high quality water to its residents. Three alternatives were considered for the project <br />including: <br />1. Noaction alternative <br />2. Rehabilitation of existing well <br />3. Re-drill the well <br />Alternative 1, No-action alternative -This was not an acceptable option since operation of the <br />well is imperative to meeting water supply demands of the town. <br />Alternative 2, Rehabilitation of existing well -This was not selected because the existing well <br />casing has deteriorated beyond the point of rehabilitation. <br />Alternative 3, Re-drill Well #5- This was the selected alternative since the well is a critical part <br />of the Bennett water supply system. Re-drilling the well will help the town maintain adequate <br />water service to its residents. <br />Selected Alternative <br />The preferred alternative is to re-drill Well #5. The well has been a critical and reliable part of <br />the Bennett water supply system for over 34 years. The Colorado Division of Water Resources <br />has issued a permit to drill a replacement well within 200 feet of the existing well, and no <br />additional legal actions will be required. <br />The Total Project cost is estimated to be: <br />1. Consulting $ 20,000 <br />2. Re-Drilling/Completing Well $ 260,000 <br />TOTAL <br />$ 280,000 <br />Schedule -With Well #5 inoperable, Bennett will likely be unable to meet the water demands <br />during the summer months in 2008. It is therefore critical to re-drill and complete Well #5 <br />before next summer. The project was bid in December of 2007. A construction contract was <br />executed with Henkle Drilling & Supply. Construction is expected to commence in late January <br />of 2008. <br />