My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11a
CWCB
>
Board Meetings
>
DayForward
>
1-1000
>
11a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:34:19 PM
Creation date
1/17/2008 4:25:06 PM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
1/22/2008
Description
CF Section – Construction Fund and Severance Tax Trust Fund Perpetual Base Account – New Loans - Pagosa Area Water & Sanitation District - Dry Gulch Reservoir Project Land Purchase
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Pagosa Area Water & Sanitation Dishict <br />7anuaiy 14, 2007 <br />Page 6 of 6 <br />Staff Recommendation <br />.Agenda Item l la <br />Staff recommends the Board approve a loan not to exceed $11,217,060 ($11,106,000 for project costs and <br />$111,060 for the 1% Loan Service Fee) to the Pagosa Area Water & Sanitation District acting by and through <br />its Enterprise for project costs associated with the land acquisition for the future Dry Gulch Reservoir site <br />from the CWCB Construction Fund. The loan amount shall at no time exceed 90% of Project expenses. The <br />terms of the loan shall be a 30-year loan at 3.~0% per annum. Security for the loan shall be in compliance <br />with CWCB Financial Policy #5. <br />Staff fuf-ther recommends that final approval of the loan be conditioned upon all other standard contracting <br />provisions of the CWCB. In addition, the following Supplemental Loan Contract Conditions shall apply: <br />1) If any parcel of land purchased with CWCB loan funds is sold in part (or whole) the proceeds generated <br />from the sale in excess of the expenses of the sale shall be applied to the remaining balance of the CWCB <br />loan within 6 months of the date of sale. Annual payments shall remain unchanged unless the loan contract is <br />amended as described in the contract documents. <br />2) CWCB disbursements for the purchase of the Laverty property shall not be made until an appraisal is <br />performed by a Colorado Certified General Appraiser and submitted to CWCB. <br />Email copy: Carrie Weiss, Manager, Pagosa Area W&S District <br />Fred Schmidt, President, San Juan Water Conservancy District <br />Steve Haf-ris, PE, Harris Engineering <br />Amy Stengel, AGO <br />Attachment: Water Project Construction Loan Program -Project Data Sheet <br />
The URL can be used to link to this page
Your browser does not support the video tag.