Laserfiche WebLink
contingent on resolution of the items in the Issues/Additional Needs section of <br />the Board Notebook memo (also listed on the CWCB website). All products, <br />data and information developed as a result of this grant must be provided to <br />CWCB in hard copy and electronic format as part of the project documentation. <br />This information will in turn be made ~~ idely available to Basin Roundtables and <br />the general public and will help promote the development of a common technical <br />platform. The motion was approved unanimously (8-0). <br />Orchard Cite -Orchard Cite Reservoir Project <br />Tape 4, Track 1 00:44:38 - 1:13:47 <br />Action: A motion «%as made by Keith Catlin and seconded by Eric Willcinson to <br />approve staff recommendation that the Board approve up to $480,000 to help <br />complete the Orchard Cite Reseivoil~ Project -Final Design, with the stipulation <br />that the aw-arded finds are matched with local funds. All products, data and <br />information developed as a result of this grant must be provided to CWCB in <br />hard copy and electronic format as part of the project documentation. This <br />information ~yill in turn be made wider- available to Basin Roundtables and the <br />general public and ~~-i11 help promote the development of a common technical <br />platform. The motion ryas approved unanimously (8-0). <br />Overland Ditch and Reservoir Company- -Overland Reservoir Dam <br />Eipansioi~/Restoration <br />Tape 4, Track 1 L 13:48 - 1:19:08 <br />Action: A motion «as made by Keith Catlin and seconded b~- Don Schwindt to <br />approve staff recommendation that the Board a«ard funds of up to $68,000 to <br />assist with the costs associated with environmental compliance and permitting of <br />the Overland Reservoir Dam Enlargement. This recommendation in contingent <br />on resolution of the items in the Issues/Additional Needs section of the Board <br />notebook memo (also on the CWCB ~yebsite). It should be noted that past costs <br />can not be reimbursed. The motion was approved unanimously (8-0). <br />North Fork Water Conservancy District and the Fire Mountain Canal and Reservoir <br />Compan~T -Sedimentation Management Studv_ for Paonia Reservoir <br />Tape 4, Track 1 00:40:23 - 00:44:36 <br />Action: A motion was made by Keith Catlin and seconded by Don Schwindt to approve <br />staff recommendation that the Board award funding of up to $79,000 from the <br />Basin Account and $230,000 from the State«~ide Account to assist with the costs <br />associated with the Paonia reservoir Sedimentation Study. It should be noted that <br />past costs can not be reimbursed. The motion was approved unanimously (8-0). <br />North Fork River hnproyement Association -Paonia-Feldman Diversion Reconstruction <br />Project <br />Tape 4, Track 1 00:34:44 - 00:40:23 <br />Action: A motion ryas made by Keith Catlin and seconded by Eric Will~ison to approve <br />staff recommendation that the Board approve funding of up to $48,000 fi-om the <br />Basin Account to assist with the engineering and design of the Paonia and Feldman <br />headgates. Staffalso recommends funding of up to $62,700 from the Statewide <br />Account to assist ~~th the construction of the Paonia and Feldman headgates. It <br />Flood Fi~otecuon • Water Supply Planning and Finance • Su~eam and Lalie Frotecrion <br />Water Supply Fiotection . Conszi~~ation and Drought Planning <br />I~ <br />