Laserfiche WebLink
Section 5 <br />Addressing the Water Supply Gap Technical Roundtable <br />Implementation Issues: <br />~ Potential for increased compact call. <br />~ Additional in-basin storage. <br />~ Diminished flows in rivers below proposed <br />diversions with potential increases in TDS and <br />other water quality impacts. <br />~ Phosphorus levels in Dillon Reservoir. <br />~ Green Mountain Reservoir levels. <br />~ Green Mountain Reservoir/Wolcott Reservoir <br />Swap. <br />Potential Attributes: <br />~ Delivery to North Fork of South Platte upstream <br />of Denver Metro area for gravity delivery to <br />Denver Water customers and other water <br />providers. <br />~ Protect or enhance Blue River flows. <br />~ Exchanges for additional flows in Colorado <br />headwaters. <br />~ Multi-purpose storage for endangered species <br />and other Colorado Basin needs. <br />~ Ability to exchange water for Summit County <br />Municipal and Industrial purposes. <br />~ Recreation component for Wolcott Reservoir. <br />5.4.7 Yampa Pumpback <br />The Yampa Pumpback Project would draw water <br />from the Yampa River and transport it through an <br />approximately 250-mile network of pipelines, <br />pumps, and reservoirs to the Front Range. <br />Figure 5-26 shows three pipeline alignments <br />presented in the NCW CD 2006 reconnaissance <br />study titled the "Multi-Basin Water Supply <br />Investigation. " <br />Water would be diverted from the Yampa River just <br />north of Maybell. A 500,000 AF reservoir would be <br />constructed to capture flows producing a firm yield <br />of approximately 300,000 AF annually. Deliveries of <br />500 cubic feet per second (cfs) would be made to <br />the Front Range through a single 108-inch diameter <br />pipeline or paralle178 inch pipelines or a <br />combination of the two. Where possible, the <br />pipeline would be placed along existing easements, <br />avoid wilderness areas and national parks, and <br />minimize impacts in other areas through the use of <br />tunnels. A 75,000 AF reservoir would be built along <br />the Front Range northwest of Fort Collins, which <br />would provide approximately 2 months of aqueduct <br />delivery. Both West Slope and East Slope reservoirs <br />would be constructed as earthfill dams. <br />Approximately three pump stations with 60 AF <br />reservoirs would be necessary to move water from <br />west to east. Three hydropower stations may be <br />included in the eastern segment. <br />According to the report, the Yampa River at Maybell <br />is of good water quality (TDS less than 300 mg/L) <br />and would likely not require treatment levels <br />exceeding conventional treatment. Preliminary <br />analysis in the study concluded that the diversion of <br />300,000 AF of firm yield annually could be operated <br />in such a manner to avoid potential constraints <br />imposed by the Colorado River Compact obligations <br />and Endangered Species Act (ESA) compliance on <br />the Yampa and Green River. Additional <br />environmental documentation would be required to <br />ensure fulfillment of ESA requirements as well as <br />assess environmental and recreational impacts. A <br />major rafting reach and endangered species are <br />downstream of the proposed diversion. A <br />preliminary project schedule proposes construction <br />of the reservoirs followed by the other necessary <br />components beginning in March 2019. According to <br />this schedule, water supplies could be online by <br />May 2023. <br />5-40 FINAL DRAFT <br />