My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
S6_11-15-04
CWCB
>
SWSI
>
DayForward
>
S6_11-15-04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/26/2010 9:24:17 AM
Creation date
1/10/2008 11:00:07 AM
Metadata
Fields
Template:
SWSI
Basin
Statewide
Title
SWSI Phase 1 Report - Section 6 Water Needs Assessment
Date
11/15/2004
Author
CWCB
SWSI - Doc Type
Final Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Section 6 <br />Water Needs Assessment <br />Table 6-4 Detailed Identified Proiects and Processes forthe Arkansas Basin <br />. <br />. . .. <br />Otero Unincorporated 0 N Arkansas Valley Pipeline would Arkansas Valley Pipeline Study and <br />(cont.) Otero County improve water qualiiy and reduce Arkansas Basin Roundtable <br /> transit losses. There are concerns feedback <br /> over future supplies as Fry-Ark may <br /> be oversubscribed, and return flows <br /> and firm ield less than lanned. <br />Prowers Lamar 250 N Arkansas Valley Pipeline would Arkansas Valley Pipeline Study and <br /> improve water qualiiy and reduce Arkansas Basin Roundtable <br /> transit losses. There are concerns feedback <br /> over future supplies as Fry-Ark may <br /> be oversubscribed, and return flows <br /> and firm ield less than lanned. <br /> Wiley 50 N Arkansas Valley Pipeline would Arkansas Valley Pipeline Study and <br /> improve water qualiiy and reduce Arkansas Basin Roundtable <br /> transit losses. There are concerns feedback <br /> over future supplies as Fry-Ark may <br /> be oversubscribed, and return flows <br /> and firm ield less than lanned. <br /> May Valley Water 50 N Arkansas Valley Pipeline would Arkansas Valley Pipeline Study and <br /> Association improve water qualiiy and reduce Arkansas Basin Roundtable <br /> transit losses. There are concerns feedback <br /> over future supplies as Fry-Ark may <br /> be oversubscribed, and return flows <br /> and firm ield less than lanned. <br /> Unincorporated 100 N Arkansas Valley Pipeline would Arkansas Valley Pipeline Study and <br /> Prowers Co. improve water qualiiy and reduce Arkansas Basin Roundtable <br /> transit losses. There are concerns feedback <br /> over future supplies as Fry-Ark may <br /> be oversubscribed, and return flows <br /> and firm ield less than lanned. <br />Pueblo Pueblo BOWVV 0 Y Have existing direct flow, storage, Alan Ward, Pueblo Board of Water <br /> trans-basin, and exchan e ri hts. Works <br /> St. Charles Mesa 0 N Will continue to acquire additional Steve Witte, Division 2 Engineer <br /> agricultural rights as needed and will <br /> grow into Bessemer Ditch irrigated <br /> acres. <br /> Pueblo West 0 N Will continue to acquire additional Steve Witte, Division 2 Engineer <br /> agricultural rights as needed. <br /> Acquired water rights outside of <br /> service area and own ranch in Upper <br /> Arkansas basin. <br /> Boone - - - Didn't res ond <br /> Avondale W&SD - - - Didn't res ond <br /> Beulah Water Works 0 Y Surface water supplies; 750,000 Charles Hutchinson, Secretary to the <br /> District gallon storage capaciiy for 163 Board of Directors <br /> families; projects are ongoing with <br /> grants/loans from Colorado <br /> De artrnent of Local Affairs. <br /> Rye 0 Y Surface water supply from Greenhorn Town Clerk <br /> Creek and two wells (one for watering <br /> school lawns and other for drinking <br /> water); 50,000 gallon storage tank <br /> being installed presently; Board not <br /> concerned about water su lies. <br /> Colorado Ci - - - Didn't res ond <br />r~ <br />S:\REPORIIWORD PROCESSING\REPORllS6 11-8-04.DOC 6-21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.