My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
S1_11-15-04
CWCB
>
SWSI
>
DayForward
>
S1_11-15-04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/26/2010 9:24:17 AM
Creation date
1/10/2008 10:14:47 AM
Metadata
Fields
Template:
SWSI
Basin
Statewide
Title
SWSI Phase 1 Report - Section 1 Introduction
Date
11/15/2004
Author
CWCB
SWSI - Doc Type
Final Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Section 1 <br />Introduction <br />The CWCB's Drought & Water Supply Assessment was <br />conducted in the fall of 2002. The primary goal of the <br />study was to analyze and summarize information <br />gathered during the assessment that would provide <br />justification for initiatives that drive future resource <br />allocation to benefit local communities susceptible to <br />drought. <br />State water planners and managers had reason to <br />improve their understanding of drought and drought <br />impacts on the Colorado water user community, given <br />changing public perceptions, competing uses for water, <br />and the impacts of the current drought. For these <br />reasons, the CWCB undertook the Drought & Water <br />Supply Assessment to engage Colorado water users to: <br />^ Determine how prepared Colorado has been for <br />drought <br />^ Identify limitations, and related measures, to better <br />prepare us for future droughts <br />The major objective that has been identified for the state <br />to address with respect to Colorado's water users needs <br />is to improve water availability and reliability statewide, <br />which is not differentiated by water use or user. In fact, <br />all water users in all geographic regions identified a need <br />for improved water availability and reliability - including <br />water for domestic and municipal use, water for <br />agricultural use, water to support natural stream flows <br />and lake levels, water for firefighting, and water for <br />commercial and industrial use. <br />~, ~ ~ ~ <br />Ma'or Ob'ective for State Water Policies <br />1 1 <br />~ Improve water availability and reliability statewide <br />Areas of Practice to Achieve the Major Objective* <br />Improve public understanding and knowledge of state <br />water and water resource issues <br />- Support infrastructure needs of water users <br />- Support technical assistance needs of water users <br />* Based on data and opinions collected from Colorado's water <br />Related areas of practice that Colorado's water users <br />identified as needing state involvement, which will <br />address the major objective, include: <br />~~ <br />^ Improving public understanding and knowledge of <br />state water and water resources issues <br />^ Supporting infrastructure needs of water users <br />^ Supporting technical assistance needs of water users <br />By addressing these three specific areas of practice, the <br />state can address the major objective of improving water <br />availability and reliability statewide. <br />1.6 Acknowledgements <br />SWSI is the product of the vision, commitment, and <br />dedication of countless Coloradans toward meeting the <br />state's future water needs. Governor Owens and the <br />Colorado Legislature provided strong direction and <br />support for moving the project forward. The DNR and its <br />Director, Russell George, gave continuous support to <br />SWSI. CWCB Board members are to be commended for <br />providing the foresight needed to undertake SWSI, <br />committing significant time in shaping and guiding the <br />process, and giving unwavering support for the Initiative. <br />The Director of CWCB, Rod Kuharich, likewise <br />committed his time and support for the project and <br />dedicated staff resources toward ensuring SWSI's <br />success. CWCB's Project Manager, Rick Brown, was <br />consistently the "voice of SWSI," devoting much of his <br />energy to meeting the significant demands of the project, <br />and working hard to truly understand the issues and <br />interests of Basin Roundtable members and the general <br />public. <br />The SWSI consultant team led by CDM was staffed as <br />follows: Project Director - Susan Morea; Technical <br />Director - Kelly DiNatale; Engineering Analysis - John <br />Rehring; Project Management- Nicole Rowan; Project <br />Facilitation - Paul Brown; Decision Science - Dan <br />Rodrigo; Water Supply Analysis - Gordon McCurry; <br />Demographics/Demands - Bill Davis; Public Relations - <br />Steve Coffin, GBSM; Data Analysis - Steven Malers, <br />Riverside Technology inc. and Erin Wilson, Leonard Rice <br />Consulting Water Engineers; Environmental Analysis - <br />Tom Pitts, Water Consult. <br />We are also grateful to the following CWCB staff who <br />helped produce this final report: Randy Seaholm, Dan <br />McAuliffe, Ray Alvarado, Dan Merriman, Steve Miller, <br />Andy Moore, Michelle Garrison, Mike Serlet, and Carolyn <br />Fritz. <br />~~ <br />Sfvtewide Woter Supoly Initiofive <br />~ -H S:\REPORT\WORD PROCESSING\REPORT\S1 11-7-04.DOC <br />
The URL can be used to link to this page
Your browser does not support the video tag.