My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SWSI Phase 2 SOW_6-10-05
CWCB
>
SWSI II Technical Roundtables
>
DayForward
>
SWSI Phase 2 SOW_6-10-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2009 10:30:04 AM
Creation date
1/8/2008 3:27:18 PM
Metadata
Fields
Template:
SWSI II Technical Roundtables
Title
SWSI Phase 2 Scope of Work
Date
6/10/2005
SWSI II - Doc Type
Scope of Work
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SWSI Phase 2 Scope of Work <br />2. Technical Roundtables -where local interests (water providers, water users, local <br />governments, representatives of federal and state agencies, environmentalists, <br />recreationalists, and members of each basin, etc.) will meet and exchange ideas for <br />each technical area. The focus will primarily be on a consensus building process to <br />address technical issues and approaches in a statewide forum. A portion of the <br />meeting will also be devoted to obtaining information and comment from the <br />public. <br />3. Basin Roundtables -where local basin interests (water providers, water users, <br />local governments, representatives of federal and state agencies, <br />environmentalists, recreationalists, etc.) will meet to receive information from the <br />TRTs to discuss the issues associated with each basin. The focus will primarily be <br />on a consensus building process to address specific issues within each river basin. <br />A portion of the meeting will also be devoted to obtaining information and <br />comment from the public. <br />4. Colorado Water Conservation Board -meets every 2 months to discuss and <br />resolve water issues and to support water planning in Colorado. The CWCB has <br />representatives from each river basin as well as key state policymakers (i.e., <br />Directors of Department of Natural Resources [DNR], CWCB, Agriculture, <br />Colorado Department of Wildlife [CDOW], State Engineer's Office [SEO], and the <br />Attorney General). The CWCB will review information from the TRTs, BRTs, and <br />public and provide input on the development of water supply options and <br />alternatives development and the strategies for implementation. The CWCB will <br />support the efforts of each TRT and BRT and also focus on identifying and <br />resolving potential conflicts among basin objectives and strategies. Opportunity <br />for TRT, BRT participant, and public input will be provided at each meeting. <br />5. CWCB Steering Committee -This committee will consist of four CWCB board <br />members, senior CWCB management and staff, and the Consultant. The focus of <br />this group will be on the detailed implementation and management of SWSI <br />Phase 2. <br />Information on the SWSI will be available during the project on the CWCB website <br />and through other communications media. Feedback from the public is encouraged <br />throughout the study period. More detailed and technical communication will occur <br />at the local basin level and at the TRTs. <br />`~ ~ <br />\\DENSVR01\SWSI\PHASE 2 WORK PLAN\SWSI PHASE 2 SOW 6-10-OS.DOC <br />
The URL can be used to link to this page
Your browser does not support the video tag.