Laserfiche WebLink
<br />problems for Frisco, 9017' every year with 9012' at the end of September <br />is optimal. <br /> <br />Comments: Some mitigation of low reservoir levels may be possible by extending the <br />walkway to moorings or by using "star docks" with a taxi service <br />(preferable to increased dredging). Fluctuation 15 to 20 feet may be <br />possible then. Note that marina flooding if reservoir levels raised above <br />9019~ may also be a problem~ <br /> <br />** For comparison - DenverlSununit County Agreement Dillon Reservoir Target Levels: <br /> <br />June 24 - July 15 <br />July 16 - August 10,2000 <br />August 2 - September 7 <br /> <br />9000 ft~ <br />9015 ft <br />9010 ft. <br /> <br />Constraints: New South Platte Reservoir <br />Normal snow pack <br />No restraint on Denver's yield <br />Precedence over other reservoir levels and hydropower production <br />