Laserfiche WebLink
<br />North Platte Basin Roundtable Technical Meeting #2 <br />Meeting Summary <br /> <br />consideration and discussion by the BRT. The preliminary draft list discussed by the BRT <br />members at the meeting is appended to this meeting summary. <br /> <br />Feedback from the BRT members on the preliminary list of options follows: <br /> <br />. Nl - Coalmont Reservoir <br />No filing (current) <br />Water right abandoned in 2001 <br />Would improve ag reliability on Grizzly Peak - Tier 3 <br />No known project sponsor <br />Would need financial assistance <br />. It was suggested that any reservoir having a valid water right should be Tier 2 <br />. Damifiano/Richland Reservoir <br />12,S80 AF conditional rights abandoned <br />Tier 3 <br />. N3 - Unnamed Colorado Creek <br />No filing <br />Tier 3 <br />. N4 - Case Flats Reservoir <br />100,000 AF potential <br />Limited supply due to existing reservoirs on Illinois River <br />Located on refuge <br />Tier 3 <br />. NS - Willow Creek Reservoir <br />Source would be other creeks <br />Ag use <br />No water right <br />Tier 3 <br />. N6 - Michigan River <br />Tier 3 <br />Looked at in past <br />. N7 - North Platte <br />Studied by BOR <br />SO,OOO AF to 1 MAF potential storage <br />Has potential to satisfy environmental requirements for both Wyoming and Colorado <br />May be workable under Compact <br />Should be an alternative looked at by state <br />Could drop water into Laramie and increase supply to Poudre <br />Long-term project but look at it <br />. N8 - Hyannis Reservoir <br />Has valid rights <br />Tier 2 <br />On forest <br />Rights held by Dave Meyring <br /> <br />CDIVI <br /> <br />5 <br /> <br />N Platte BRT Mtg #2 Summary.doc 4/16/2004 <br />