My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rio_Grande_BRT_Mtg_4_Summary
CWCB
>
SWSI
>
DayForward
>
Rio_Grande_BRT_Mtg_4_Summary
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2009 10:33:13 AM
Creation date
1/4/2008 11:03:55 AM
Metadata
Fields
Template:
SWSI
Basin
Rio Grande
Title
Meeting Summary 4
Date
8/19/2004
SWSI - Doc Type
Summaries
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Rio Grande Basin Roundtable Technical Meeting #4 <br />Meeting Summary <br /> <br /> <br />Mike Gibson San Luis Valley Water Conservancy Water Conservancy and Conservation Districts <br /> District <br />Bob Robins Conejos Water Conservancy District Water Conservancy and Conservation Districts <br />Allen Davey Rio Grande Water Conservation District Water Conservancy and Conservation Districts <br />Technical Advisors <br />Raymond Wright Colorado Water Conservation Board X <br />David Robbins Assisting Ray Wright <br />Ralph Curtis Assisting Ray Wright <br />Jeff Johnson Division of Wildlife State Agencies X <br />Steve Vandiver Division Engineer State Agencies <br />Pete Clark Rio Grande National Forest State Agencies X1 <br />Cindy Rivera (for Pete Rio Grande National Forest State Agencies X <br />Clark) <br />Doug Krieger Division of Wildlife State Agencies <br />John T onko Division of Wildlife State Agencies X <br />Mike Blenden USFWS Federal Agencies <br />1 Substitute attended <br /> <br />Kelly DiNatale reviewed the agenda for the meeting. The agenda included: <br /> <br />. A review of the SWSI process and status <br />. Final gap analysis, demand revisions and determination of gap by subbasin or county <br />. Water supply availability at determined locations <br />. Alternatives development, importance of identified options and processes, and options <br />scorIng. <br />. Implementation using partnering and overview of various funding sources <br />. SWSI Wrap-Up including post-November activities <br />. SWSI Public presentation <br />. Public comment session <br /> <br />Copies of the presentation materials were distributed to BRT members. Comments and <br />questions received throughout the meeting were recorded on flip charts and are included in the <br />meeting notes below. The summary is not intended to be a verbatim account and answers to the <br />questions are not always summarized here. The purpose of the summary is to provide an <br />overview of the process and the general tenure of the meeting. <br /> <br />SWSI Update <br /> <br />Rick Brown presented the SWSI update. Since the last BRT Meeting, the team has refined the <br />gap analysis, scored options for the development of alternatives including environmental and <br />recreation alternatives, completed the analysis of supply, evaluated conservation savings, and <br />have been working on report preparation. Rick also requested BRT feedback on the desired <br />message the basin would like SWSI to communicate to the Legislature, the overall value of the <br />SWSI process, what has been answered, what has not, and requested input on moving forward. <br /> <br />CDIVI <br /> <br />2 <br /> <br />Rio Grande BRT Mtg #4 Summary.doc 11/29/2004 <br />
The URL can be used to link to this page
Your browser does not support the video tag.