Chatfield Reallocation Study: Meeting Minutes 06/13/2007
Date
6/13/2007
Prepared For
Meeting Participants
Prepared By
CWCB
Floodplain - Doc Type
Meeting Summary
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. What feedback mechanisms will USACE/TT recognize and implement to <br />expedite/maintain project schedule? <br />. Should Tetra Tech, USACE, and/or FWS attend the subcommittee meetings? <br />Other Mitigation Issues <br />Environmental <br /> <br />. Weare looking for the quantification of impacts related to the change in reservoir <br />pool elevation on wetlands; habitat; and water quality, including the impact of <br />submerging the large trees on each. <br />. When/how will potential synergies between environmental mitigation actions be <br />characterized? <br />. Does the environmental mitigation need to occur prior to storing water? <br />. What will the EIS/FR include regarding weed control/tree sapling control in the <br />areas between 5444' and 5432'? <br />. Will the environmental mitigation plan be integrated with the recreational <br />mitigation activities? <br />. When will we be provided with the results and assumptions with water quality <br />modelling? <br />. When will the Section 7 assessment be available for review? Be incorporated into <br />the mitigation plan? <br />. When will project coalition provide input? <br /> <br />Recreational Issues <br />. When does revised EDAW (20,600 AF/7,680 AF) report come out for coalition <br />revi ew? <br />. How will recreation mitigation be integrated with environmental mitigation design <br />and construction, including 404 permitting issues for recreational mitigation? <br />. When and how will the large tree impacts be assessed regarding access to future <br />recreational facilities, in-lake recreational experience, etc. be evaluated and <br />mitigated? <br />. How and when will it be determined whether or not the Park will remain open <br />during construction? <br /> <br />Read Ahead <br />Monday June 18th, the coalition has a meeting in Washington DC with important members <br />of the USACE HQ civil works staff. The purpose of the meeting is to discuss topics of <br />relevance regarding the development of the FR/EIS, issues with funding and conducting the <br />seismic stability report (SSR), preparation of water contracts between USACE and CWCB, <br />and FY08 federal appropriations. The specific topics discussed and supported by the <br />subcommittee included: <br /> <br />. Obtaining example RODs that have been developed by the USACE for other <br />reallocation projects, especially those that have water supply components associated <br /> <br />3 <br />