Laserfiche WebLink
<br />.3 " <br /> <br />o TT will be discussing those with the Corps next week. <br />o The WQ workgroup didn't think a more advanced WQ model was necessary. <br />o WQ report will be made available to team when completed. <br /> <br />Recreation Impact Study Process Update (Paul Flack) <br />. Park Board was briefed. <br />. Operation modcl (HEC 5) was received from COE <br />o Want to make sure water level representation within BEC model is reasonable <br />rcprcsentation of how reservoir will operate. <br />o Final modeling should be completed by end of July, and then an iterative process with <br />group will occur. This will allow analysis of 5' increase. Current analysis includes only <br />12' increase. <br />o COE, Tetra Tech, and Parks need to coordinate on different alternatives for EIS analysis. <br />Parks win have map by late July or early August showing proposed facility relocations. <br /> <br />Other Discussion <br />. No other significant issues noted <br /> <br />Next Meeting Date <br />· The next Chatfield Reallocation progress meeting is scheduled for August 17,2006 at the Tetra <br />Tech office in Lakewood. Meeting time is 10:00am. <br /> <br />Meeting Attendance Sheets (attached below): <br /> <br />Flood Protection. Water Project Planning and Fmance . Stre,lm and Lake Protection <br />Water Supply Protection. Conservation Planning <br />