My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
EagleRiver WCPlan Applic
CWCB
>
Water Efficiency Grants
>
Day Forward
>
EagleRiver WCPlan Applic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2011 9:34:27 AM
Creation date
12/14/2007 9:54:29 AM
Metadata
Fields
Template:
Water Efficiency Grants
Water Efficiency Grant Type
Water Conservation Planning Grant
Contract/PO #
OE PDA 08-67
Applicant
Eagle River Water and Sanitation District
Project Name
Eagle River Water and Sanitation District Water Conservation Plan
Title
HB-104 Water Conservation Planning Grant Application
Date
10/24/2007
County
Eagle
Water Efficiency - Doc Type
Application
Document Relationships
EagleRiver WCPlan 2012
(Message)
Path:
\Water Conservation\DayForward
EagleRiver WCPlan 95%PR
(Message)
Path:
\Water Efficiency Grants\Day Forward
EagleRiver WCPlan Invoice
(Message)
Path:
\Water Efficiency Grants\Day Forward
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Eagle River Water & Sanitation District CWCB 'Water Conservation Grant Application <br />Page 17 of 17 <br /> <br />.List of_fundine: Sources: <br /> <br />A list of funding sources for the Water Conservation Plan development process is <br />provided in '-fable 5 which includes the requested CWCB grant and District In-Kind <br />Contributions~ Attachment G includes a detailed project budget. <br /> <br />Table 5: Water Co <br /> <br />t. PI T tiP · t B d t d F ding Sources <br /> <br />nserva Ion an oa rOJec u 1ge an un <br /> -- <br />TOTAL Project Budget $56,748 <br />TOT Al DISTRICT Contribution $15,378 <br />Percentage of Total Project Budget 270/0 <br />ewes Grant Requested $41,370 <br /> <br />7~ Detailed oroiect bude:et: <br /> <br />A detailed project budget including estimated hours by District and H~ydrosphere staff, <br />the District's Board of Directors, and the Water Conservation Advisory Committee, as <br />well as direct costs, is included in Attachment G. The total project budget is $56,748. <br />The District's in-kind contribution is $15,378, which is 27% of the total project budget <br />The District is requesting a grant in the amount of $41,370 to cover the remaining costs <br />to develop a Water Conservation Plan which will meet and exceed the State's <br />requirements and provide a model for other Colorado resort communities. <br /> <br />References <br /> <br />Bernstein and Associates, Inc., 2006, Draft #1 ERWSD - Water Operations Cash Flow: <br />Schedule 1 Incremental and Cumulative SFE's by Project - Water Operations for the <br />Years Ending December 31, 1998 through ,December 31, 2025. <br />
The URL can be used to link to this page
Your browser does not support the video tag.