My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LeftHand_WCPlan_Applic
CWCB
>
Water Efficiency Grants
>
Day Forward
>
LeftHand_WCPlan_Applic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2012 4:08:44 PM
Creation date
12/13/2007 3:13:39 PM
Metadata
Fields
Template:
Water Efficiency Grants
Water Efficiency Grant Type
Water Conservation Planning Grant
Contract/PO #
OE PDA 08-69
Applicant
Left Hand Water District
Project Name
Left Hand Water District Water Conservation Plan
Title
Grant Application for Left Hand WD WCP
Date
9/10/2007
County
Eagle
Water Efficiency - Doc Type
Application
Document Relationships
LeftHand_WCPlan_PO
(Message)
Path:
\Water Efficiency Grants\Day Forward
LeftHandWCPlan2009
(Message)
Path:
\Water Conservation\DayForward
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />6.4 Define evaluation criteria: <br />Staff and CWS will develop criteria used to select the conservation <br />measures/programs for implementation. Key criteria will be cost for <br />implementation and potential water savings. <br /> <br />6.5 Select conservation measures and programs: <br />CWS will summarize the evaluation of each measure/program based on <br />the evaluation criteria and indicate, with staff and Board input, which <br />measures/programs will be implemented. The water savings from the <br />implementation will be estimated using Worksheet 6-3 as a guide. <br /> <br />Step 7 -Integrate Resources and Modify Forecasts <br /> <br />Purpose <br /> <br />The activities described under this task will modify the supply and demand forecasts to <br />account for water savings from the selected conservation measure,s and programs. The <br />benefits of conservation as well as revenue effects will also be addressed. <br /> <br />Approach <br /> <br />7.1 Revise demand forecast: <br />CWS will revise the demand forecast prepared inStep 2 to account for the <br />water savings of the measures/programs from Step 6. Worksheet 7-1 will <br />be used as a guide. <br /> <br />7.2 Identify project-specific savings: <br />Staff and CWS will determine the effect of water savings from <br />conservation on the timing and capacity of facility improvement projects <br />and quantify savings~ <br /> <br />7.3 Revise supply-capacity forecast: <br />CWS will revise the supply capacity forecast based on findings from 7.2. <br /> <br />7.4 Summarize forecast modifications and benefits of conservation: <br />CWS will develop a graph showing demand and supply with and without <br />conservation. <br /> <br />7.5 Consider revenue effects: <br />CWS will quantify impacts to revenues from implementation of water <br />conservation. Savings in capital improvement projects or delayed water <br />acquisition will be presented against loss in sales revenue. Strategies to <br />address this issue will be discussed. <br /> <br />Clear \\later Solutions.. Inc. <br />Left Hand Wate.. District (:WC1B Grant App.lication <br /> <br />12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.