My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Minutes Joint Front Range BRT meeting_111307.d (2)
CWCB
>
Basin Roundtables
>
DayForward
>
Minutes Joint Front Range BRT meeting_111307.d (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2010 11:58:32 AM
Creation date
12/6/2007 12:25:52 PM
Metadata
Fields
Template:
Basin Roundtables
Basin Roundtable
Metro
Additional Roundtables
Arkansas
South Platte
Title
Minutes for Joint Roundtable
Date
11/13/2007
Basin Roundtables - Doc Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
TRT Meeting Notes <br />Yampa Pumpback -Eric Wilkinson <br />Eric Wilkinson described the history of Yampa Pumpback thought the IBCC could pickup this <br />project. <br />NCWCD does not want to see the dry up of agriculture >11 their area. <br />Yampa and South Platte have met on this project. Yampa Bas>11 has some concerns: ESA, <br />wildlife, scenic, rec uses, water quality, agricultural water and front range market. Want 60,000 <br />acre-feet from a project. <br />Jeff Draper presented details of Yampa Pumpback. <br />Questions: <br />How many reservoirs? <br />Jeff Draper: 500,000 acre-feet on West Slope; 75,000 acre-feet on East Slope <br />Did annual O&M cost include debt recovery: <br />Jeff Draper: No. <br />Can you give us an idea of costs of study? <br />Jeff Draper: $100,000 <br />Don't you think it would be valuable to do a benefit cost comparison with the other Pumpback <br />Projects that would only be about $500,000? <br />Jeff Draper: Yes <br />One of $Ze issues that was not addressed was water rights associated with t11is. It is impossible <br />to plan for a large project. T11is coupled wit11 ?legislation for Colorado Basin of origin without <br />West Slope and transbasin diversion support. Will you8 Put the water rights filing together and <br />get t11e users def>11ed to Pass t11e can and will test? <br />Eric Wilkuzson -NCWCD will not file for the water rights. <br />Don Ament -Quantify t11e benefits for the West Slope. <br />Teris Danielson: 60,000 acre-feet of yield for West Slope, West Slope needs to come to table, can <br />upsize reservoir near Maybell for releases. CBT diverters could buy >11 to this project and leave <br />water in headwaters. <br />~~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.