My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD11041
CWCB
>
Floodplain Documents
>
DayForward
>
1
>
FLOOD11041
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 10:19:32 AM
Creation date
11/29/2007 1:23:11 PM
Metadata
Fields
Template:
Floodplain Documents
County
Statewide
Basin
Statewide
Title
Colorado Flood Map Modernization Business Case Plan - Final Draft - Fiscal Years 2004-2008
Date
3/1/2004
Prepared For
FEMA Region 8
Prepared By
CWCB
Floodplain - Doc Type
Educational/Technical/Reference Information
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
149
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SECTIONONE <br />ProgramVision <br />• March - Receive funding notification from FEMA and select areas (counties) for flood <br />mapping studies for the current Federal Fiscal Year (FY). <br />• April through May - Conduct Scoping Meetings for each selected county for the current <br />FY and finalize Scopes of Work. <br />• May through June - Approve finalized contract, initiate map updates for DFIRMs <br />funded in the current FY, and attempt to maintain a maximum one-year schedule to <br />produce preliminary DFIRM products. <br />• July through following June - Complete preliminary DFIRM products. <br />• Ongoing - Update prioritization list to reflect map update needs that are addressed when <br />new DFIRMs become effective. Post effective FIRM and FIS information on the Internet <br />as it becomes effective. <br />The schedule above will have to be altered considerably for FY '04 to meet FEMA's <br />expectations while taking account of the fact that CWCB staff time from July 2003 through <br />February 2004 was taken with three major activities: <br />o Establishment of the Colorado Map Modernization Progr~am; <br />o Implementation of the FY '03 mapping projects; and <br />o Completion of the Business Case Plan. <br />The proposed FY'04 schedule is shown below: <br />• March 2004 - Perform Initial Coordination Meetings <br />• March through mid-Apri12004- Compute and submit cost estimates <br />• April 2004 - Reevaluate statewide needs <br />• Not Needed Because BCP Report Just Completed - Updating scoping tools, etc. <br />• April 2004 - Receive funding notification from FEMA <br />• Mid-April through May 2004 - Conduct Scoping Meetings and finalize Scopes of <br />Work <br />• May through June 2004 - Approve finalized contracts; initiate map updates <br />• July 2004 through June 2005 - Complete preliminary DFIRM products <br />Colorado Business Case Plan (Final Draft) 1-5 <br />