Laserfiche WebLink
<br />I <br />. <br />.. <br /> NTM CWCB Water Conservation Plan Grant Application Page 8 of 10 <br /> Table 5: Project Plan <br />" I <br /> Task # Task Responsible Party and Description of Work Deliverables/M ilestones <br /> Includes Project Orientation for all team members. <br /> NTM: Assemble data and other information needed for <br /> subtask completion as requested by Hydrosphere. <br /> Review draft work products and provide feedback to <br /> Profile Existing Water Hydrosphere. Hvdrosphere: Make data requests to <br /> System (CWCB NTM and locate additional data as needed. Provide "Existing Water System" <br /> Guidance Document quality control and analyze data. Develop text, tables, chapter of Water I <br /> 1 Step 1) and figures, and complete applicable worksheets. Conservation Plan (WCP) <br /> NTM: Work with Hydrosphere to identify information <br /> needs and to characterize current water use based <br /> upon available data. Select a demand forecast <br /> methodology. Provide data and other information <br /> needed for subtask completion. Review draft work <br /> products and provide feedback to Hydrosphere. <br /> Hvdrosphere: Make data requests to NTM and locate <br /> Develop a Water Use additional data as needed. Review and provide <br /> Profile and Forecast feedback to NTM regarding quality and accuracy of <br /> Future Water Demand data and demand projection methodology. Analyze "Water Use Profi e and <br /> (CWCB Guidance data. Develop text, tables, figures, and complete Forecast Future yv ater <br /> 2 Document Step 2) applicable worksheets. Demand" chapter of WCP <br /> NTM: Assemble data and other information needed for <br /> subtask completion. Work closely with Hydrosphere to <br /> select a methodology and complete a cost analysis of <br /> planned facilities. Review draft work products and <br /> provide feedback to Hydrosphere. Hvdrosphere: <br /> Assist NTM in evaluating potential cost analysis <br /> Profile Proposed methodologies. Make data requests to NTM, provide <br /> Facilities (CWCB quality control of data, and complete cost analysis. <br /> Guidance Document Develop text, tables, figures and complete applicable "Proposed Facilities" <br /> 3 Step 3) worksheets. chapter of WCP I <br /> NTM: Work with Hydrosphere to develop lists of <br /> existing and potential water conservation goals, <br /> screening criteria, measures and programs. Review <br /> draft work products and provide feedback to <br /> Hydrosphere. Solicit Board input on goals, screening <br /> criteria and conservation measures. Hvdrosphere: <br /> Identify Conservation Work with NTM to develop a preliminary list of existing <br /> Goals, Measures and and potential water conservation goals, measures and "Conservation Goals" and <br /> Programs (CWCB programs and screening criteria. Develop text, tables, "Potential Consehtation <br /> Guidance Document figures and complete applicable worksheets. Make I <br /> Measures and Programs" <br /> 4 Steps 5 and 6) revisions in response to Board input. chapters of WCR <br /> NTM: Compile data and other information needed for <br /> subtask completion. Work with Hydrosphere to screen <br /> initial and final list of measures and programs. Review <br /> draft work products and provide feedback to <br /> Hydrosphere. Schedule and run a board meeting to <br /> review and solicit input. Hvdrosphere: Request/locate <br /> data for use in evaluating water conservation activities <br /> Evaluate and Select from NTM, other sources and current literature. <br /> Conservation Complete initial and final screenings of conservation <br /> Measures and measures working closely with NTM. Develop text, "Evaluate and Select <br /> Programs (CWCB tables, and figures, and complete applicable Conservation MJasures <br /> Guidance Document worksheets. Participate in NTM board meeting and and Programs" dhapter of <br /> 5 Step 6) make revisions in response to input. WCP I <br />