My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
NTM_WCPlan_Application
CWCB
>
Water Efficiency Grants
>
Day Forward
>
NTM_WCPlan_Application
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2011 9:32:17 AM
Creation date
11/28/2007 1:09:22 PM
Metadata
Fields
Template:
Water Efficiency Grants
Water Efficiency Grant Type
Water Conservation Planning Grant
Contract/PO #
OE PDA 08-54
Applicant
North Table Mountain Water & Sanitation District
Project Name
North Table Mountain Water & Sanitation District Water Conservation Plan
Title
Grant Application for Water Conservation Planning Grant
Date
10/12/2007
County
Jefferson
Water Efficiency - Doc Type
Application
Document Relationships
NTM_WCPlan2009
(Message)
Path:
\Water Conservation\DayForward
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />.. <br /> <br />;0 <br /> <br />NTM CWCB Water Conservation Plan Grant Application Page 7 of 11 <br /> <br /> <br />treatment plant is designed to easily expand to 11 MGD. Dnring the District's buLst <br />periods, current use does not exceed 5.9 MGD. Five treated water storage tanks Jre <br />located throughout the service area, ranging in size from 0.5 to 2.5 million gallon~. <br />Water is delivered throughout NTM's service area by 78.7 miles of water mains. <br /> <br />In 2006 NTM diverted the largest volume in its history for a total of2,800 acre-fe1et,just <br />under half of its entitlement. At pre-drought (2000) per capita water use levels, tHe 100% <br />build out scenario (all developable acreage at 3 houses per acre and 2.62 people pbr <br />household) would translate into a total annual water demand of over 9,000 afper year. <br />Assuming full use of the 6,000 af from Denver, this would require an additional 31,000 af <br />from other water supplies. Even assuming 2006 per capita water use rates, at buird out <br />NTM would require an additional 1,400 af of additional sJ.lpply annually. As the humber <br />of residents in Colorado and along the Front Range grows, new water supplies arJ <br />increasingly difficult and expensive to acquire. NTM recognizes that it must inclhde <br />water conservation as an essential tool in managing current and future demands. <br /> <br />Waste Water Treatment and Storage <br />NTM contracts with Metro Wastewater for all wastewater treatment. NTM is responsible <br />for wastewater lines and pump stations required to deliver waste to Metro's system. As <br />NTM's service area continues to grow, so will the need for new and expanded wa~tewater <br />conveyance lines. <br /> <br />6. Description of the proiect plan: <br /> <br />North Table Mountain Water and Sanitation District proposes to develop a Waterl <br />Conservation Plan using the CWCB's "Water Conservation Plan Development Guidance <br />Document" as a guide. NTM may adjust sections and worksheets as necessary tol <br />represent its specific circumstances. NTM's Water Conservation Plan will be designed to <br />meet the requirements of House Bills 91..1154 and 04-1365. <br /> <br />NTM will provide project oversight and proposes to hire Hydrosphere Resource <br />Consultants to assist in the development of the Water Conservation Plan. Hydrosphere <br />has experience working with the CWCB's guidance document and in writing plan's that <br />meet and exceed State requirements. Table 5 below includes a detailed descriptidn of <br />work to be performed under each Project task including responsibilities, deliveraThles and <br />milestones. Attachment C provides additional details regarding the roles of specirc <br />NTM and Hydrosphere project team members. Table 6 is a proposed Project schedule <br />including progress reports to the CWCB. Attachment F is the Project budget, inc[uding a <br />breakdown of hours by organization and staff member for each task. Funding soilirces are <br />listed in Table 7. <br /> <br />All tasks generally follow the CWCB guidance document unless otherwise noted. The <br />level of analysis undertaken in any specific task will depend on the availability of <br />existing information. Extensive new research or financial and/or planning analys1es that <br />would be more appropriately addressed in a Master Plan will not be completed u~der this <br />Project due to the resources this would require. <br />
The URL can be used to link to this page
Your browser does not support the video tag.