Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />City of Brush <br />Opinion of Probable Construction Costs <br /> <br />Sunset Park <br /> <br />QUANTITY <br /> <br />UNIT <br /> <br />UNIT COST <br /> <br />AMOUNT <br /> <br />Alternative 1, 25-Year Event <br />18" RCP Class III 180 LF $40.00 $7,200.00 <br />24" RCP Class III 120 LF $60.00 $7,200.00 <br />30" RCP Class III 60 LF $85.00 $5,100.00 <br />36" RCP Class III 410 LF $100.00 $41,000.00 <br />42" RCP Class III 450 LF $120.00 $54,000.00 <br />48" RCP Class III 2650 LF $130.00 $344,500.00 <br />5' Manhole 9 EA. $4,000.00 $36,000.00 <br />3' Type 13 Combination Inlet 4 EA. $2,500.00 $10,000.00 <br />6' Type 13 Combination Inlet 7 EA. $4,700.00 $32,900.00 <br />9' Type 13 Combination Inlet 8 EA. $6,900.00 $55,200.00 <br />Asphalt. Removal 2750 SY $3.00 $8,250.00 <br />Asphalt Paving 2750 SY $18.00 $49,500.00 <br />C&G Removal 160 LF $5.00 $800.00 <br />C&G Install 39 LF $10.00 $390.00 <br />Landscape 1 LS $1,500.00 $1,500.00 <br /> Total $653,540.00 <br />CONTINGENCY (25%) 25% $163,385.00 <br /> SUBTOTAL $816,925.00 <br />ENGINEERING (10%) 10% $81 ,692.50 <br /> GRANDTOTAL $898,617.50 <br /> <br />* Correlates with Alternatives 4 & 5 in 2002 City of Brush Stormwater System Study <br />