Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />City of Brush <br />Opinion of Probable Construction Costs <br /> <br />Sunset Park <br /> <br />QUANTITY <br /> <br />UNIT <br /> <br />UNIT COST <br /> <br />AMOUNT <br /> <br />Alternative 1. 10.Y.~ar Event <br /> <br />18" RCP Class III <br />24" RCP Class III <br />30" RCP Class III <br />36" RCP Class III <br />42" RCP Class III <br />5' Manhole <br />3' Type 13 Combination Inlet <br />6' Type 13 Combination Inlet <br />9' Type 13 Combination Inlet <br />Asphalt Removal <br />Asphalt Paving <br />C&G RElmoval <br />C&G Install <br />Landscape <br /> <br />180 LF $40.00 $7,200.00 <br />120 LF $60.00 $7,200.00 <br />60 LF $85.00 $5,100.00 <br />410 LF $100.00 $41,000.00 <br />2650 LF $120.00 $318,000.00 <br />8 EA. $4,000.00 $32,000.00 <br />5 EA. $2,500.00 $12,500.00 <br />8 EA. $4,700.00 $37,600.00 <br />6 EA. $6,900.00 $41,400.00 <br />2215 SY $3.00 $6,645.00 <br />2215 SY $18.00 $39,870.00 <br />150 LF $5.00 $750.00 <br />38 LF $10.00 $380.00 <br />1 LS $1,500.00 $1,500.00 <br /> Total $551,145.00 <br /> 25% $137,786.25 <br /> SUBTOTAL $688,931.25 <br /> 10% $68,893.13 <br /> GRANDTOTAL $757,824.38 <br /> <br />CONTINGENCY (2!i%) <br /> <br />ENGINEERING (10%) <br /> <br />* Correlates with Alternatives 4 & 5 in 2002 City of Brush Stormwater System Study <br />