Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />City of Brush <br />Opinion of Probable Construction Costs <br /> <br />Downtown Clayton Street <br /> <br />Alternative 2. 10-Year Event <br /> <br />Asphalt Removal <br />Asphalt Paving <br />Asphalt Overlay <br />Waterline Relocation <br />18" RCP Class III <br />24" RCP Class III <br />30" RCP Class III <br />42" RCP Class III <br />60" RCP Class III <br />60" RCP Jacked <br />3' Type 13 Combination Inlet <br />6' Type 13 Combination Inlet <br />9' Type 13 Combination Inlet <br />Inlet Removal <br />5' Manhole <br />6' manhole <br />Removal Manhole <br />C&G Removal <br />C&G Install <br />Regrading of Claylton Street, N. Railway to Edmunds Street <br />Asphalt Removal <br />Concrete Removal <br />Asphalt Paving <br /> <br />CONTINGENCY (2!>%) <br /> <br />ENGINEERING (10%) <br /> <br />QUANTITY <br /> <br />UNIT <br /> <br />UNIT COST <br /> <br />AMOUNT <br /> <br />4890 SY $3.00 $14,670.00 <br />4850 SY $18.00 $87,300.00 <br />30000 SY $5.00 $150,000.00 <br />803 LF $100.00 $80,300.00 <br />30 LF $40.00 $1,200.00 <br />50 LF $60.00 $3,000.00 <br />70 LF $85.00 $5,950.00 <br />2850 LF $120.00 $342,000.00 <br />3150 LF $170.00 $535,500.00 <br />950 LF $1,000.00 $950,000.00 <br />2 EA. $2,500.00 $5,000.00 <br />6 EA. $4,700.00 $28,200.00 <br />1 EA. $6,900.00 $6,900.00 <br />9 EA. $1,000.00 $9,000.00 <br />10 EA. $4,000.00 $40,000.00 <br />15 EA. $4,500.00 $67,500.00 <br />2 EA. $1,500.00 $3,000.00 <br />70 LF $5.00 $350.00 <br />70 LF $10.00 $700.00 <br />2710 SY $3.00 $8,130.00 <br />2710 SY $15.00 $40,650.00 <br />6400 SY $18.00 $115,200.00 <br /> Total $2,494,550.00 <br /> 25% $623,637.50 <br /> SUBTOTAL $3,118,187.50 <br /> 10% $311,818.75 <br /> GRANDTOTAL $3,430,006.25 <br /> <br />* Correlates with alternative 2 in 2002 City of Brush Stormwater System Study <br /> <br />Note: Costs noted as .. Regrading of Clayton Street, N. Railway to Edmunds Street <br />are additional costs, above and beyond typical storm sewer construction <br />costs, required to remove the excessive asphalt crown and underlying concrete <br />pavement to provide improved conveyance capacity. <br />