Laserfiche WebLink
<br />ii I <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />City of Brush <br />Opinion of Probable Construction Costs <br /> <br />Downtown Clayton Street <br /> <br />Alternative 1. 10-YE~ar Event <br /> <br />Asphalt Removal <br />Asphalt Paving <br />Asphalt Overlay <br />Waterline Relocation <br />18" RCf> Class III <br />24" RCf> Class III <br />30" RCP Class III <br />42" RCf> Class III <br />3' Type 13 Combination Inlet <br />6' Type 13 Combination Inlet <br />9' Type 13 Combination Inlet <br />Inlet Removal <br />5' Manhole <br />Removal Manhole <br />C&G Removal <br />C&G Install <br />Grading for Retention Facility <br />Regrading of Clayton Street, N. Railway to Edmunds Street <br />Asphalt Removal <br />Concrete Removal <br />Asphalt Paving <br /> <br />CONTINGENCY (2S%) <br /> <br />ENGINEERING (10~:to) <br /> <br />QUANTITY <br /> <br />UNIT <br /> <br />UNIT COST <br /> <br />AMOUNT <br /> <br />1670 SY $3.00 $5,010.00 <br />2300 SY $18.00 $41,400.00 <br />15000 SY $5.00 $75,000.00 <br />803 LF $100.00 $80,300.00 <br />30 LF $40.00 $1,200.00 <br />430 LF $60.00 $25,800.00 <br />70 LF $85.00 $5,950.00 <br />2100 LF $120.00 $252,000.00 <br />2 EA. $2,500.00 $5,000.00 <br />6 EA. $4,700.00 $28,200.00 <br />1 EA. $6,900.00 $6,900.00 <br />9 EA. $1,000.00 $9,000.00 <br />9 EA. $4,000.00 $36,000.00 <br />2 EA. $1,500.00 $3,000.00 <br />70 LF $5.00 $350.00 <br />70 LF $10.00 $700.00 <br />8.5 AC-FT $16,000.00 $136,000.00 <br />2710 SY $3.00 $8,130.00 <br />2710 SY $15.00 $40,650.00 <br />6400 SY $18.00 $115,200.00 <br /> Total $875,790.00 <br /> 25% $218,947.50 <br /> SUBTOTAL $1,094,737.50 <br /> 10% $109,473.75 <br /> GRANDTOTAL $1,204,211.25 <br /> <br />* Correlates with alternative 1 in 2002 City of Brush Stormwater System Study <br /> <br />Note: Costs noted as .. Regrading of Clayton Street, N. Railway to Edmunds Street <br />are additional costs, above and beyond typical storm sewer construction <br />costs, required to remove the excessive asphalt crown and underlying concrete <br />pavement to provide improved conveyance capacity. <br />