My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD10505
CWCB
>
Floodplain Documents
>
DayForward
>
1
>
FLOOD10505
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 10:13:34 AM
Creation date
11/9/2007 10:17:41 AM
Metadata
Fields
Template:
Floodplain Documents
County
Morgan
Community
Brush
Basin
South Platte
Title
Brush - Storm Drainage Master Plan
Date
7/19/2006
Prepared For
Brush
Prepared By
Nolte Associates, Inc.
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />i! ' <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />I'JOlTE <br /> <br />City of Brush <br />Storm Drainage Master Plan <br /> <br />BEYOND ENGINEERING <br /> <br />North Central Area <br />For the North Central Area, Alternative 1 has a significantly higher cost than Alternative <br />2 but provides much less risk to neighboring areas as a result of overflows from other <br />drainage basins. We recommend Alternative 1 with a 25-yr. design capacity for the North <br />Central Area. Alternative 2 is strongly discouraged because it does not provide a pipe <br />outfall from the low lying area and the area would be subject to much greater risk of <br />flooding in the event of inadvertent overflows from the nearby Brush Lateral. <br /> <br />South Railroad Area <br />For the South Railroad Area one alternative was considered. The stormwater system cost <br />is relatively high for both the 10-year and 25-year alternatives. Due to the relatively high <br />cost of the alternative, no improvements are recommended as part of the Storm Drain <br />Master Plan. If street improvements are made in that area, there may be a potential to <br />reduce intersection or other local flooding in select areas as part of future street <br />improvements. <br /> <br />Lincoln/Mill Street <br />The Lincoln/Mill Street Basin is a very large basin with potential overflows to several <br />other basins. Alternative 1 conveys stormwater from the Basin out of the area but has a <br />very high cost of $8.5 to $9.0 million. Altemative 2 includes a local retention pond at <br />much lower total costs. Given the very large size of the basin (264 acres) and the <br />potential for overflows and resulting damage to other basins, Altemative 2 with a design <br />storm of 100-years is recommended. <br /> <br />The total cost of the recommended improvements for all areas is approximately $6.5 <br />million. A summary of the recommended altemative costs is included in Table 3. <br /> <br />Nolte Associates,Inc. <br /> <br />16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.